Spare Parts Planning — Overview

Most tools forecast what you used. Sparely prepares you for what's coming — and proves it.

Reorder now
1,160
739 critical (A/B or SCE) · Rp 123.8B
Covered by identical stock
77
Rp 2.2B not bought
Excess to release
Rp 573.3B
3,505 materials · at PO prices
Stockouts in replay (May–Sep 26)
952 → 209
Current Min–Max → Sparely policy · critical 878 → 127
Demand days served from stock
69% → 93%
Inventory held -54%

My work

No decisions taken yet in this browser.

Process

From SAP extracts to an approved purchase requisition

  1. 1Baseline data

    6 files: 7,481 parts, 14,484 FuncLocs, 16,655 issues, 5,795 notifications, 10,153 plan items, 6,189 PO lines

  2. 2Clean & link

    25 data-quality checks (duplicates, units, currencies, cycles); parts linked to equipment, failures, purchases and the maintenance plan

  3. 3Forecast & optimize

    Hybrid demand forecast (bias 10% vs 115% static), ML early warning (AUC 0.89), cost–risk optimizer calibrated to 99 emergencies / yr

  4. 4Role workspaces

    Maintenance requests job parts; the Planner uses identical stock first, then approves reorders and Min–Max; Procurement gets a PR draft

  5. 5Proven impact

    Replaying May–Sep 2026: stockouts 952 → 209, demand days served 69% → 93%, inventory held -54%

Case requirements coverage

Each expected output of the brief, where it is in the system, and the live evidence

Expected output / key questionWhereEvidence (live)
Demand forecasting (history, failures, maintenance, shutdowns, installed base, abnormal use)Demand Forecast826 planned part lines in 12 months; turnaround split out; abnormal issues capped
Dynamic Min–Max, safety stock, reorder point, replenishment qtyPlanner workspace1,160 reorders; Min–Max recomputed per part on every request
Inventory health: excess, slow-moving, non-moving, potentially obsoleteInventory Health1,848 non-moving · 1,161 potentially obsolete
Reorder / maintain / reduce / monitor, balancing cost vs stockout & downtime riskMaterial List1,160 reorder · 3,505 reduce · 1,494 monitor · 1,258 maintain
Stockout risk & overstock riskMaterial List138 critical parts ≥ 50% stockout risk · excess Rp 573.3B at PO prices
Slow-moving alertInventory Health730 parts not issued for > 180 days
Cost–risk optimization scenarios (raise / lower inventory)Cost–Risk ScenariosPresets + live re-optimization of all parts + efficient frontier + replay under the scenario
Shutdown and turnaround activitiesMaintenanceLast turnaround found in the data (360 parts); readiness for the next one with order-by dates
Right part available at the right time (the core problem)Inventory Health77 needs covered by the same item held under another material number · Rp 2.2B not bought
Equipment and spare part criticality, incl. process safetyMaterial List860 safety-critical parts (safety and shutdown valves) costed as class A and never left without a spare · 544 long-lead critical parts flagged
Governed decisionsManagement22 buys and 985 reductions need Management sign-off; every decision is logged
Evidence that the policy worksManagementReplay of 3,035 real demand days: 878 → 127 stockouts on critical parts
Key Q1 — predictability of irregular demandDemand ForecastDemand split by cause, installed-base pooling, ML early warning, out-of-time backtests
Key Q2 — balance inventory cost, availability, operational riskCost–Risk ScenariosPer-part service level chosen by minimum holding + downtime-risk cost