Cost–Risk Optimization Scenarios
Simulate raising or lowering inventory levels and see the trade-off between working capital, holding cost and downtime risk. Apply a scenario to drive every recommendation in the app.
Scenario presets
Parameters
Production loss per downtime day (Rp billion)
Calibrated from data
Probability that one stockout actually stops production, calibrated so today's Min–Max reproduces the 99 emergency notifications per year in Notif History:A
1.07%
B
0.53%
C
0.16%
S
0.05%
Optimized 7,481 spare parts
Replayed on real demand (May–Sep 2026) under this scenario
Stockouts
952 → 209
On critical parts
878 → 127
Demand days served
68.6% → 93.1%
Avg inventory held
Rp 986.4B → Rp 455.9B
Today's static Min–Max → Sparely policy for this scenario. The cards below are the cost model's annual expectation.
Average inventory value
Rp 260.0B-96%
Today's static Min–Max: Rp 5.81T
Holding cost / yr
Rp 52.0B-96%
Today's static Min–Max: Rp 1.16T
Expected downtime-risk cost / yr
Rp 13.0B-100%
Today's static Min–Max: Rp 5.44T
Downtime events from stockouts / yr
0.3-100%
Today's static Min–Max: 98.9
Stockouts / yr (all parts)
213-98%
Today's static Min–Max: 9,625
Actions in this scenario
1,160 reorder (Rp 123.8B) · 3,505 reduce (Rp 5.62T)
138 critical parts with ≥50% stockout risk before replenishment
Trade-off: inventory investment vs downtime risk
Blue line: every stocked part held at the same service level (80% → 99.9%). Moving right buys availability with working capital. The Sparely point optimizes each part separately, so it reaches the same risk with less inventory. Today's static Min–Max (Rp 5.81T inventory, Rp 5.44T risk / yr) is far off this chart — see the first row below.
| Service level | Avg inventory | Holding / yr | Risk / yr | Downtime events / yr |
|---|---|---|---|---|
| Today's static Min–Max | Rp 5.81T | Rp 1.16T | Rp 5.44T | 98.9 |
| Sparely optimized | Rp 260.0B | Rp 52.0B | Rp 13.0B | 0.3 |
| 80.0% | Rp 172.7B | Rp 34.5B | Rp 198.7B | 3 |
| 85.0% | Rp 188.2B | Rp 37.6B | Rp 147.0B | 2.3 |
| 90.0% | Rp 206.5B | Rp 41.3B | Rp 97.9B | 1.5 |
| 95.0% | Rp 262.2B | Rp 52.4B | Rp 48.3B | 0.8 |
| 97.0% | Rp 307.7B | Rp 61.5B | Rp 29.5B | 0.5 |
| 99.0% | Rp 421.6B | Rp 84.3B | Rp 12.0B | 0.3 |
| 99.5% | Rp 474.1B | Rp 94.8B | Rp 7.8B | 0.2 |
| 99.9% | Rp 570.6B | Rp 114.1B | Rp 4.4B | 0.2 |