BEARING,BALL,ANGULAR,6216BDB

Material 4100000142 · BEARING · Plant 1000

AMonitorHealthy
Material
4100000142
Category
BEARING
Base unit
EA
MRP type
Non Stock
Criticality
A (54 of 76 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
61 d · P80 84 d
Unit price
Rp 2.0M

Recommendation

  • 1.Forecast 98 EA/year: 95 unplanned (recency-weighted compound poisson (own history)) + 2.9 from the maintenance plan.
  • 2.Lead time ~61 days; expected demand during lead time 16.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 48, order up to 76.
  • 4.Installed on 76 FuncLoc(s), 54 of them criticality A/B.
  • 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningConvert to Stock ItemLast turnaround used 14Single sourceAbnormal consumptionOpen PO
On hand / on order
1 / 273
next delivery 08 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
48
safety stock 33
Rec. Max
76
order qty 28
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.0M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 30 issue days in the last 180 days, last issue 1 days ago, 38 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 15 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (19 units) excluded from the baseline.

Demand pattern Erratic · 81 issue days · 6 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 29.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 76 functional locations

54 with criticality A/B · 93 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_KC-419A
PROPYLENE FAN
A1195.71
UT_PP-818B
RICH AMINE PUMP
A1124.90
PX_KC-536A
LUBE OIL BLOWER
A1114.42
PX_PP-1460A
SEAL OIL PUMP
A193.19
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_PP-790A
CHARGE GAS PUMP
A172.76
PX_KC-226
HYDROGEN AIR COMPRESSOR
A162.28
PX_KC-452
HYDROGEN FAN
A162.71
PX_KC-479C
DILUTION STEAM COMPRESSOR
A152.71
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_PP-1192
FEED PUMP
A151.47
PX_PP-1022
QUENCH WATER PUMP
A131.47

Lead time and procurement

Lead time 61 ± 33 days (PO history, 38 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
15 Sept 2026PR06
Regular replenishment
60Rp 2.1M18 Oct 2026
open
33 d
11 Sept 2026PR06
Regular replenishment
61Rp 2.0M29 Oct 2026
open
48 d
09 Sept 2026PR03
Regular replenishment
35Rp 2.0M08 Oct 2026
open
29 d
26 Aug 2026PR05
Project / turnaround
46Rp 2.0M19 Nov 2026
open
85 d
16 Aug 2026PR06
Regular replenishment
36Rp 2.1M24 Sept 202639 d
05 Aug 2026PR06
Regular replenishment
43Rp 2.0M27 Sept 202653 d
29 Jul 2026PR05
Project / turnaround
66Rp 2.0M18 Sept 202651 d
13 Jul 2026PR03
Regular replenishment
64Rp 2.0M20 Aug 202638 d
29 Jun 2026PR06
Regular replenishment
65Rp 1.9M07 Aug 202639 d
26 Jun 2026PR03
Regular replenishment
71Rp 2.1M26 Oct 2026
open
122 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Jan 2027PX_PP-615APump overhaul0.72
02 Mar 2027PX_PP-1744Pump overhaul0.72
02 Jul 2027PX_PP-200APump overhaul0.72
13 Aug 2027PX_PP-1397Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-679BOverhaul PP-679B
28 Sept 2026HighPY_KC-419AOverhaul
24 Sept 2026LowPX_PP-715ALeak from packing
24 Sept 2026LowUT_PP-818BReplace lamp as per PM finding
23 Sept 2026MediumPX_PP-790APP-790A abnormal noise
23 Sept 2026MediumPY_KC-419AInspect coupling KC-419A
22 Sept 2026HighPX_KC-536AOverhaul
20 Sept 2026MediumPX_PP-679BPP-679B seal leak
18 Sept 2026MediumPY_KC-419AInstall scaffolding at KC-419A
16 Sept 2026MediumPX_KC-891AKC-891A high vibration

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20262201000010300Corrective
30 Sept 20261201000019926Corrective
27 Sept 20262209000029477Other maintenance
25 Sept 20262201000013019Corrective
21 Sept 20261201000009141Corrective
04 Sept 20261201000030840Corrective
30 Aug 20261203000017844Turnaround
24 Aug 20262201000000994Corrective
15 Aug 20262201000011252Corrective
10 Aug 20261201000016696Corrective
08 Aug 20261201000036904Corrective
03 Aug 20261201000010583Corrective
24 Jul 20261201000002081Corrective
23 Jul 20261201000000709Corrective
22 Jul 20261201000021281Corrective