BEARING,BALL,1ROW,DEEP GROOVE,6305

Material 4100000203 · BEARING · Plant 1000

AMaintainHealthy
Material
4100000203
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (19 of 31 FuncLocs A/B)
Supplier
MITRA SARANA INTERNASIONAL PT
Lead time
65 d · P80 81 d
Unit price
Rp 1.7M

Recommendation

  • 1.Forecast 34 EA/year: 32 unplanned (recency-weighted compound poisson (own history)) + 2.1 from the maintenance plan.
  • 2.Lead time ~65 days; expected demand during lead time 7.1 (incl. 1.4 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 19, order up to 37.
  • 4.Installed on 31 FuncLoc(s), 19 of them criticality A/B.
  • 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 5Single sourceOpen POPlanned demand in lead time
On hand / on order
6 / 56
next delivery 02 Oct 2026
Today Min / Max
4 / 6
static parameters in BoM
Rec. Min (reorder point)
19
safety stock 12
Rec. Max
37
order qty 18
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.7M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 12 issue days in the last 180 days, last issue 57 days ago, 25 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 8 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (11 units) excluded from the baseline.

Demand pattern Smooth · 32 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 31 functional locations

19 with criticality A/B · 41 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_KC-419A
PROPYLENE FAN
A1195.71
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-732D
METHANOL COMPRESSOR
A163.14
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KC-752A
CONDENSATE BLOWER
A141.85
PX_PP-1471A
METHANE PUMP
A141.47
PX_PP-244A-M
MOTOR FOR PP-244A
A131.47
PX_KC-106B
GASOLINE BLOWER
A121.00
PX_PP-987A
INHIBITOR PUMP
A121.05
PX_KC-426D
RICH AMINE BLOWER
A100.57
PX_PP-103A-M
MOTOR FOR PP-103A
A100.19
PX_PP-1604A
DILUTION STEAM PUMP
A400.19

Lead time and procurement

Lead time 65 ± 25 days (PO history, 14 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
21 Aug 2026PR03
Regular replenishment
11Rp 1.7M26 Oct 2026
open
66 d
23 Jul 2026PR03
Regular replenishment
9Rp 1.6M17 Sept 202656 d
18 Jul 2026PR05
Project / turnaround
18Rp 1.7M16 Oct 2026
open
90 d
16 Jul 2026PR04
Regular (other)
27Rp 1.7M02 Oct 2026
open
78 d
19 Jun 2026PR03
Regular replenishment
11Rp 1.7M30 Aug 202672 d
17 May 2026PR05
Project / turnaround
14Rp 1.7M06 Aug 202681 d
27 Apr 2026PR03
Regular replenishment
23Rp 1.7M17 Jul 202681 d
04 Apr 2026PR03
Regular replenishment
25Rp 1.7M11 Jun 202668 d
05 Mar 2026PR06
Regular replenishment
8Rp 1.7M05 May 202661 d
22 Dec 2025PR03
Regular replenishment
18Rp 1.6M13 Apr 2026112 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_PP-556APump overhaul1.43
07 Jul 2027PX_KC-505DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026HighPY_KC-419AOverhaul
24 Sept 2026EmergencyPX_KC-538KC-538 high vibration
23 Sept 2026MediumPX_KC-513KC-513 high vibration
23 Sept 2026MediumPY_KC-419AInspect coupling KC-419A
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPY_KC-419AInstall scaffolding at KC-419A
17 Sept 2026MediumPX_PP-1471AReplace lamp as per PM finding
17 Sept 2026MediumPX_PP-411AReplace bearing PP-411A
16 Sept 2026EmergencyPX_KC-538Leak from packing
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A

Recent goods issues

Posting dateQtyOrderOrder type
05 Aug 20262205000008171Other maintenance
29 Jul 20261201000001418Corrective
15 Jul 20261201000023109Corrective
01 Jul 20263201000025988Corrective
23 Jun 20261209000027470Other maintenance
22 Jun 20261201000023783Corrective
17 Jun 20261209000016742Other maintenance
15 Jun 20261201000030870Corrective
05 Jun 20262201000005500Corrective
12 May 20261201000003548Corrective
15 Apr 20262201000012829Corrective
13 Apr 20261201000027566Corrective
26 Mar 20261204000036669Preventive
21 Mar 20261201000005983Corrective
03 Mar 20262201000026477Corrective