BEARING,BALL,ANGULAR,6318-2Z
Material 4100000257 · BEARING · Plant 1000
AMaintainHealthy
- Material
- 4100000257
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (15 of 20 FuncLocs A/B)
- Supplier
- MITRA PERKASA NUSANTARA PT
- Lead time
- 49 d · P80 68 d
- Unit price
- Rp 1.0M
Recommendation
- 1.Forecast 14 EA/year: 14 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~49 days; expected demand during lead time 1.8.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 22.
- 4.Installed on 20 FuncLoc(s), 15 of them criticality A/B.
- 5.ML early warning: 90% probability of demand in the next 90 days.
ML early warningLast turnaround used 2Single sourceOpen PO
On hand / on order
8 / 16
next delivery 06 Nov 2026
Today Min / Max
5 / 11
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
22
order qty 14
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.0M
PO history
ML early warning: 90% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 28 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (8 units) excluded from the baseline.
Demand pattern Intermittent · 21 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 20 functional locations
15 with criticality A/B · 20 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KC-778A CONDENSATE COMPRESSOR | A | 1 | 3 | 1.43 |
| PX_PP-412 REFLUX PUMP | A | 1 | 3 | 1.05 |
| PX_KC-137A C4 PRODUCT COMPRESSOR | A | 1 | 2 | 1.43 |
| PX_KC-250D PROPYLENE FAN | A | 1 | 0 | 0.57 |
| PX_KC-669 DEMIN WATER BLOWER | A | 1 | 0 | 0.57 |
| PX_PP-1063-M MOTOR FOR PP-1063 | A | 1 | 0 | 0.19 |
| PX_PP-1348-M MOTOR FOR PP-1348 | A | 1 | 0 | 0.19 |
| PX_PP-1809B SEAL OIL PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1821-M MOTOR FOR PP-1821 | A | 1 | 0 | 0.19 |
| PX_PP-992B REFLUX PUMP | B | 1 | 8 | 3.19 |
| PX_PP-306A BFW PUMP | B | 1 | 1 | 0.19 |
Lead time and procurement
Lead time 49 ± 23 days (PO history, 12 PO lines) · on-time 48%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Aug 2026 | PR03 Regular replenishment | 16 | Rp 983,689 | 06 Nov 2026 open | 69 d |
| 18 Jul 2026 | PR06 Regular replenishment | 13 | Rp 1.0M | 11 Aug 2026 | 24 d |
| 12 Jul 2026 | PR06 Regular replenishment | 17 | Rp 1.0M | 09 Aug 2026 | 28 d |
| 23 May 2026 | PR05 Project / turnaround | 8 | Rp 987,515 | 08 Jul 2026 | 46 d |
| 11 May 2026 | PR03 Regular replenishment | 5 | Rp 993,589 | 13 Jul 2026 | 63 d |
| 03 May 2026 | PR03 Regular replenishment | 10 | Rp 990,513 | 30 May 2026 | 27 d |
| 02 Jan 2026 | PR03 Regular replenishment | 8 | Rp 1.0M | 02 Feb 2026 | 31 d |
| 23 Dec 2025 | PR06 Regular replenishment | 10 | Rp 1.0M | 30 Jan 2026 | 38 d |
| 28 Nov 2025 | PR03 Regular replenishment | 13 | Rp 1.0M | 06 Jan 2026 | 39 d |
| 10 Nov 2025 | PR06 Regular replenishment | 15 | Rp 1.0M | 27 Dec 2025 | 47 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_PP-412 | Oil leak at PP-412 bearing housing |
| 06 Sept 2026 | Medium | PX_PP-992B | PP-992B discharge pressure low |
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 08 Jul 2026 | Medium | PX_PP-298C | Replace lamp as per PM finding |
| 27 Jun 2026 | Low | PX_PP-298C | Oil leak at PP-298C bearing housing |
| 04 Jun 2026 | High | PX_KC-778A | Inspect coupling KC-778A |
| 21 May 2026 | Medium | PX_PP-992B | Replace lamp as per PM finding |
| 30 Apr 2026 | Medium | PX_PP-992B | Replace lamp as per PM finding |
| 17 Apr 2026 | Medium | PX_PP-412 | Replace bearing PP-412 |
| 07 Apr 2026 | Medium | PX_PP-1967A-M | Install scaffolding at PP-1967A-M |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Sept 2026 | 1 | 204000004134 | Preventive |
| 25 May 2026 | 3 | 203000011209 | Turnaround |
| 15 May 2026 | 2 | 201000016164 | Corrective |
| 07 Mar 2026 | 1 | 203000020244 | Turnaround |
| 14 Jan 2026 | 1 | 201000036071 | Corrective |
| 07 Jan 2026 | 1 | 201000013649 | Corrective |
| 01 Jan 2026 | 1 | 201000038744 | Corrective |
| 27 Dec 2025 | 2 | 201000013315 | Corrective |
| 22 Dec 2025 | 1 | 201000017628 | Corrective |
| 20 Dec 2025 | 1 | 201000021150 | Corrective |
| 17 Dec 2025 | 1 | 203000014056 | Turnaround |
| 11 Dec 2025 | 2 | 201000010938 | Corrective |
| 28 Nov 2025 | 2 | 201000005269 | Corrective |
| 22 Nov 2025 | 1 | 203000020131 | Turnaround |
| 19 Nov 2025 | 1 | 201000038448 | Corrective |