BEARING,BALL,1ROW,DEEP GROOVE,6210BDB
Material 4100000289 · BEARING · Plant 1000
ALong-leadMonitorHealthy
- Material
- 4100000289
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 14 FuncLocs A/B)
- Supplier
- GEMILANG TEKNIK LESTARI PT
- Lead time
- 71 d · P80 98 d
- Unit price
- Rp 6.3M
Recommendation
- 1.Forecast 21 EA/year: 21 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~71 days; expected demand during lead time 4.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 22.
- 4.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 14 FuncLoc(s), 8 of them criticality A/B.
- 6.ML early warning: 99% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 11Single sourceAbnormal consumptionOpen PO
On hand / on order
7 / 20
next delivery 27 Oct 2026
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 10
Rec. Max
22
order qty 8
Service level
100.0%
stockout risk now 0%
Unit price
Rp 6.3M
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 9 issue days in the last 180 days, last issue 10 days ago, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 7 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (11 units) excluded from the baseline.
Demand pattern Erratic · 23 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 14 functional locations
8 with criticality A/B · 16 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-106B GASOLINE BLOWER | A | 3 | 2 | 1.00 |
| PX_KC-369B-M MOTOR FOR KC-369B | A | 1 | 0 | 0.57 |
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
| PX_PP-1033 CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1099 LUBE OIL PUMP | A | 1 | 0 | 0.19 |
| PX_PP-520-M MOTOR FOR PP-520 | A | 1 | 0 | 0.19 |
| PX_PP-1370C FUEL OIL PUMP | B | 1 | 0 | 0.19 |
| PX_PP-362B FUEL OIL PUMP | B | 1 | 0 | 0.19 |
| UT_PP-641A-M MOTOR FOR PP-641A | C | 1 | 0 | 0.19 |
| PX_KC-773A REFLUX COMPRESSOR | S | 1 | 25 | 9.99 |
| PX_KC-458D SLOP OIL FAN | S | 1 | 9 | 3.14 |
| PX_KC-891A HYDROGEN FAN | S | 1 | 5 | 1.85 |
Lead time and procurement
Lead time 71 ± 28 days (PO history, 18 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Aug 2026 | PR03 Regular replenishment | 5 | Rp 6.1M | 27 Oct 2026 open | 79 d |
| 28 Jul 2026 | PR03 Regular replenishment | 19 | Rp 6.4M | 21 Sept 2026 | 55 d |
| 20 Jul 2026 | PR03 Regular replenishment | 8 | Rp 6.4M | 19 Sept 2026 | 61 d |
| 13 Jul 2026 | PR03 Regular replenishment | 15 | Rp 6.1M | 10 Nov 2026 open | 120 d |
| 26 Jun 2026 | PR03 Regular replenishment | 12 | Rp 6.3M | 12 Jul 2026 | 16 d |
| 11 Jun 2026 | PR03 Regular replenishment | 12 | Rp 6.2M | 22 Jul 2026 | 41 d |
| 07 Jun 2026 | PR03 Regular replenishment | 9 | Rp 6.2M | 21 Aug 2026 | 75 d |
| 22 Mar 2026 | PR06 Regular replenishment | 16 | Rp 6.3M | 06 May 2026 | 45 d |
| 12 Mar 2026 | PR03 Regular replenishment | 16 | Rp 6.2M | 18 Jun 2026 | 98 d |
| 12 Mar 2026 | PR03 Regular replenishment | 13 | Rp 6.5M | 25 Jun 2026 | 105 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Emergency | PX_KC-773A | Inspect coupling KC-773A |
| 19 Sept 2026 | Medium | PX_KC-458D | KC-458D lube oil filter DP high |
| 16 Sept 2026 | Low | PX_KC-458D | KC-458D lube oil filter DP high |
| 16 Sept 2026 | Medium | PX_KC-891A | KC-891A high vibration |
| 15 Sept 2026 | Low | PX_KC-773A | Install scaffolding at KC-773A |
| 23 Aug 2026 | Low | PX_KC-773A | KC-773A bearing temp high |
| 10 Aug 2026 | Low | PX_KC-773A | KC-773A high vibration |
| 09 Aug 2026 | Medium | PX_KC-773A | Inspect coupling KC-773A |
| 03 Aug 2026 | Medium | PX_KC-773A | Leak from packing |
| 20 Jul 2026 | Medium | PX_KC-773A | KC-773A high vibration |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Sept 2026 | 2 | 206000035129 | Other maintenance |
| 28 Aug 2026 | 1 | 201000016379 | Corrective |
| 23 Aug 2026 | 2 | 201000002237 | Corrective |
| 15 Aug 2026 | 1 | 201000012683 | Corrective |
| 11 Aug 2026 | 1 | 201000005848 | Corrective |
| 15 Jul 2026 | 1 | 201000024244 | Corrective |
| 10 Jun 2026 | 1 | 209000009869 | Other maintenance |
| 15 Apr 2026 | 1 | 205000017095 | Other maintenance |
| 06 Apr 2026 | 1 | 201000007594 | Corrective |
| 04 Feb 2026 | 1 | 201000037600 | Corrective |
| 22 Jan 2026 | 1 | 201000002546 | Corrective |
| 18 Jan 2026 | 1 | 201000030900 | Corrective |
| 15 Jan 2026 | 1 | 201000037819 | Corrective |
| 02 Jan 2026 | 2 | 201000017002 | Corrective |
| 02 Jan 2026 | 2 | 201000026775 | Corrective |