BEARING,BALL,ANGULAR,6304 C3

Material 4100000324 · BEARING · Plant 1000

AReorderNormalBelow reorder point
Material
4100000324
Category
BEARING
Base unit
EA
MRP type
Non Stock
Criticality
A (5 of 8 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 13 EA/year: 12 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~55 days; expected demand during lead time 1.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 22.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 19 now.
  • 5.Installed on 8 FuncLoc(s), 5 of them criticality A/B.
  • 6.ML early warning: 88% probability of demand in the next 90 days.
Proposed purchase requisition
19 EA
Rp 27.1M · order by 01 Oct 2026
Expected arrival ≈ 55 days
ML early warningConvert to Stock ItemLast turnaround used 1Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 9
Rec. Max
22
order qty 12
Service level
100.0%
stockout risk now 34%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 88% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 33 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern Lumpy · 11 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 8 functional locations

5 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_PP-882A
CONDENSATE PUMP
A110.62
PX_KC-155D
CAUSTIC BLOWER
A100.57
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_PP-1323
DILUTION STEAM PUMP
A100.19
PX_PP-468A-M
MOTOR FOR PP-468A
C100.19
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KC-210D
ETHYLENE BLOWER
S100.57

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Jan 2027PX_PP-1323Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
25 Jul 2025MediumPX_PP-882AOil leak at PP-882A bearing housing
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
29 Aug 20261201000038773Corrective
07 Jul 20262201000024234Corrective
08 Jun 20261201000010036Corrective
29 May 20262201000014554Corrective
26 Apr 20261201000000645Corrective
16 Apr 20261209000024091Other maintenance
11 Jan 20263201000037096Corrective
08 Jan 20263201000034831Corrective
19 Dec 20251203000033370Turnaround
24 Nov 20251201000034542Corrective
22 Aug 20251201000005670Corrective
19 Jul 20251201000005396Corrective