BEARING,BALL,1ROW,DEEP GROOVE,6314-2Z
Material 4100000360 · BEARING · Plant 1000
AMaintainHealthy
- Material
- 4100000360
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (11 of 15 FuncLocs A/B)
- Supplier
- MEGA UTAMA GLOBAL PT
- Lead time
- 42 d · P80 57 d
- Unit price
- Rp 1.3M
Recommendation
- 1.Forecast 18 EA/year: 18 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~42 days; expected demand during lead time 2.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 24.
- 4.Installed on 15 FuncLoc(s), 11 of them criticality A/B.
- 5.ML early warning: 95% probability of demand in the next 90 days.
ML early warningLast turnaround used 1Single sourceOpen PO
On hand / on order
13 / 16
next delivery 26 Oct 2026
Today Min / Max
4 / 7
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 7
Rec. Max
24
order qty 15
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.3M
PO history
ML early warning: 95% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 27 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern Lumpy · 18 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 15 functional locations
11 with criticality A/B · 21 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-452 HYDROGEN FAN | A | 1 | 6 | 2.71 |
| PX_KC-222B LEAN AMINE COMPRESSOR | A | 1 | 5 | 1.85 |
| PX_PP-387 INHIBITOR PUMP | A | 1 | 1 | 0.62 |
| PY_KC-636C SLOP OIL COMPRESSOR | A | 1 | 1 | 0.57 |
| PX_KC-476C ETHYLENE FAN | A | 1 | 0 | 0.57 |
| PX_KC-669 DEMIN WATER BLOWER | A | 4 | 0 | 0.57 |
| PX_PP-1224A CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PX_PP-233A SLOP OIL PUMP | A | 1 | 0 | 0.19 |
| PX_PP-536-M MOTOR FOR PP-536 | A | 1 | 0 | 0.19 |
| PX_PP-123 LEAN AMINE PUMP | B | 2 | 0 | 0.19 |
| PX_PP-577-M MOTOR FOR PP-577 | B | 1 | 0 | 0.19 |
| PX_PP-1386-M MOTOR FOR PP-1386 | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 42 ± 26 days (PO history, 7 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Sept 2026 | PR03 Regular replenishment | 16 | Rp 1.3M | 26 Oct 2026 open | 47 d |
| 18 Jun 2026 | PR03 Regular replenishment | 13 | Rp 1.3M | 17 Aug 2026 | 60 d |
| 25 Apr 2026 | PR06 Regular replenishment | 9 | Rp 1.3M | 11 May 2026 | 16 d |
| 07 Apr 2026 | PR03 Regular replenishment | 14 | Rp 1.3M | 09 May 2026 | 32 d |
| 03 Nov 2025 | PR03 Regular replenishment | 14 | Rp 1.3M | 19 Nov 2025 | 16 d |
| 25 Oct 2025 | PR03 Regular replenishment | 7 | Rp 1.3M | 28 Dec 2025 | 64 d |
| 08 Jul 2025 | PR03 Regular replenishment | 10 | Rp 1.2M | 30 Jul 2025 | 22 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Sept 2026 | Medium | PX_KC-452 | Overhaul |
| 05 Sept 2026 | Medium | PX_KC-452 | Inspect coupling KC-452 |
| 02 Jul 2026 | High | PX_KC-222B | Replace lamp as per PM finding |
| 05 Feb 2026 | Medium | PX_KC-222B | Install scaffolding at KC-222B |
| 20 Jan 2026 | Medium | PX_KC-452 | Replace lamp as per PM finding |
| 01 Jan 2026 | Low | PX_KC-222B | KC-222B high vibration |
| 16 Nov 2025 | Medium | PX_KC-222B | KC-222B lube oil filter DP high |
| 17 Oct 2025 | Low | PX_KC-452 | KC-452 bearing temp high |
| 04 Sept 2025 | Low | PX_KC-452 | Inspect coupling KC-452 |
| 11 Jun 2025 | Medium | PX_PP-387 | PP-387 seal leak |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Sept 2026 | 3 | 201000031484 | Corrective |
| 04 Aug 2026 | 1 | 204000027988 | Preventive |
| 25 Jul 2026 | 1 | 201000021629 | Corrective |
| 22 Jul 2026 | 1 | 201000005856 | Corrective |
| 02 Jun 2026 | 2 | 201000022564 | Corrective |
| 13 Apr 2026 | 2 | 205000029597 | Other maintenance |
| 24 Dec 2025 | 1 | 201000002755 | Corrective |
| 13 Dec 2025 | 1 | 201000018030 | Corrective |
| 10 Dec 2025 | 1 | 201000030810 | Corrective |
| 07 Dec 2025 | 1 | 201000007291 | Corrective |
| 06 Dec 2025 | 2 | 201000027233 | Corrective |
| 02 Dec 2025 | 1 | 201000006266 | Corrective |
| 01 Dec 2025 | 2 | 201000011143 | Corrective |
| 13 Nov 2025 | 1 | 203000023445 | Turnaround |
| 12 Nov 2025 | 3 | 201000014832 | Corrective |