BEARING,BALL,ANGULAR,6210

Material 4100000398 · BEARING · Plant 1000

AReorderCriticalBelow reorder point
Material
4100000398
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (12 of 17 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 9.4 EA/year: 9.4 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~55 days; expected demand during lead time 1.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 18.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 17 now.
  • 5.Installed on 17 FuncLoc(s), 12 of them criticality A/B.
  • 6.ML early warning: 86% probability of demand in the next 90 days.
Proposed purchase requisition
17 EA
Rp 24.2M · order by 01 Oct 2026
Expected arrival ≈ 55 days
ML early warningPrice estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
18
order qty 10
Service level
100.0%
stockout risk now 70%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 86% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 66 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 11 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 17 functional locations

12 with criticality A/B · 20 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_PP-592
FLUSHING OIL PUMP
A110.19
PX_PP-697A-M
MOTOR FOR PP-697A
A110.62
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_PP-500-M
MOTOR FOR PP-500
A100.19
PX_PP-641A
GASOLINE PUMP
A100.19
PX_PP-679B
METHANOL PUMP
B171.90
PX_KC-284A
WASH WATER COMPRESSOR
B221.43
PX_PP-1891B
SEAL OIL PUMP
B120.62
PX_PP-1892B-M
MOTOR FOR PP-1892B
B110.19
PX_PP-1575A-M
MOTOR FOR PP-1575A
B100.19

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-679BOverhaul PP-679B
20 Sept 2026MediumPX_PP-679BPP-679B seal leak
16 Sept 2026MediumPX_KC-891AKC-891A high vibration
23 Aug 2026MediumPX_PP-1891BReplace bearing PP-1891B
22 Aug 2026MediumPX_PP-679BPP-679B high vibration
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
19 Jul 2026MediumPX_PP-679BInstall scaffolding at PP-679B
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test

Recent goods issues

Posting dateQtyOrderOrder type
27 Jul 20261201000021629Corrective
01 Jul 20261201000025988Corrective
27 Apr 20263205000009944Other maintenance
22 Apr 20261201000035868Corrective
20 Apr 20261201000022747Corrective
20 Mar 20261201000005983Corrective
12 Jan 20261204000017728Preventive
11 Dec 20251201000009065Corrective
14 Nov 20251201000020069Corrective
13 Sept 20251204000028555Preventive
08 Sept 20251201000022935Corrective