BEARING,BALL,1ROW,DEEP GROOVE,6209 C3
Material 4100000436 · BEARING · Plant 1000
AReduceExcess
- Material
- 4100000436
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 9 FuncLocs A/B)
- Supplier
- PRIMA ELEKTRIK ABADI PT
- Lead time
- 45 d · P80 40 d
- Unit price
- Rp 1.2M
Recommendation
- 1.Forecast 14 EA/year: 14 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~45 days; expected demand during lead time 1.8.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 22.
- 4.Stock 39 exceeds the level to keep (22) by 17.
- 5.Installed on 9 FuncLoc(s), 8 of them criticality A/B.
- 6.ML early warning: 94% probability of demand in the next 90 days.
ML early warningLast turnaround used 1Single source
On hand / on order
39 / 0
no open PO
Today Min / Max
7 / 18
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
22
order qty 14
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.2M
PO history
ML early warning: 94% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 3 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern Intermittent · 13 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 9 functional locations
8 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_PP-1838D METHANE PUMP | A | 1 | 5 | 1.90 |
| PX_PP-535A CONDENSATE PUMP | A | 1 | 1 | 0.19 |
| PX_PP-900A LEAN AMINE PUMP | A | 1 | 1 | 0.19 |
| PX_PP-1063 C4 PRODUCT PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1253B LUBE OIL PUMP | B | 1 | 2 | 0.62 |
| PX_PP-1718-M MOTOR FOR PP-1718 | B | 1 | 1 | 0.62 |
| PX_KC-563B GASOLINE COMPRESSOR | B | 4 | 0 | 0.57 |
| PX_PP-148A-M MOTOR FOR PP-148A | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 45 ± 19 days (PO history, 4 PO lines) · on-time 30%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Jul 2026 | PR06 Regular replenishment | 3 | Rp 1.2M | 30 Aug 2026 | 33 d |
| 13 Jul 2026 | PR03 Regular replenishment | 4 | Rp 1.1M | 23 Aug 2026 | 41 d |
| 02 Mar 2026 | PR04 Regular (other) | 4 | Rp 1.2M | 10 Apr 2026 | 39 d |
| 16 Jan 2026 | PR03 Regular replenishment | 7 | Rp 1.1M | 25 Feb 2026 | 40 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Aug 2026 | Medium | PX_PP-1838D | PP-1838D abnormal noise |
| 26 May 2026 | Low | PX_KT-397A | Follow up after steam upset KT-397A |
| 16 May 2026 | Medium | PX_KT-397A | Replace lamp as per PM finding |
| 14 May 2026 | Low | PX_KT-397A | KT-397A trip test |
| 02 Apr 2026 | Medium | PX_KT-397A | Follow up after steam upset KT-397A |
| 31 Mar 2026 | Medium | PX_PP-1838D | [MSI-B-26-LPR-116/M] Replace line |
| 25 Mar 2026 | Medium | PX_PP-1253B | PP-1253B seal leak |
| 22 Mar 2026 | Medium | PX_PP-1838D | Oil leak at PP-1838D bearing housing |
| 08 Sept 2025 | Medium | PX_PP-1838D | Replace bearing PP-1838D |
| 19 Aug 2025 | Low | PX_PP-1718-M | PP-1718-M bearing noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Sept 2026 | 1 | 201000026148 | Corrective |
| 20 Sept 2026 | 1 | 201000017105 | Corrective |
| 03 Sept 2026 | 1 | 204000038666 | Preventive |
| 26 Aug 2026 | 1 | 201000033360 | Corrective |
| 25 Aug 2026 | 2 | 201000007466 | Corrective |
| 24 Jun 2026 | 1 | 201000018159 | Corrective |
| 13 Jun 2026 | 1 | 201000029044 | Corrective |
| 29 Jan 2026 | 3 | 201000038343 | Corrective |
| 28 Jan 2026 | 1 | 201000036335 | Corrective |
| 28 Dec 2025 | 1 | 203000006078 | Turnaround |
| 20 Dec 2025 | 1 | 201000001122 | Corrective |
| 16 Dec 2025 | 1 | 201000009616 | Corrective |
| 23 Sept 2025 | 1 | 201000024779 | Corrective |
| 17 Sept 2025 | 1 | 201000023016 | Corrective |