BEARING,BALL,1ROW,DEEP GROOVE,6214BDB
Material 4100000437 · BEARING · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100000437
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 9 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 44 d · P80 127 d
- Unit price
- Rp 507,462
Recommendation
- 1.Forecast 7.1 EA/year: 6.3 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
- 2.Lead time ~44 days; expected demand during lead time 0.8.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 14.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 14 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 9 FuncLoc(s), 8 of them criticality A/B.
- 7.ML early warning: 59% probability of demand in the next 90 days.
Proposed purchase requisition
14 EA
Rp 7.1M · order by 01 Oct 2026
Expected arrival ≈ 44 days
Long-leadML early warningLast turnaround used 1Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
4 / 7
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
14
order qty 8
Service level
100.0%
stockout risk now 41%
Unit price
Rp 507,462
PO history
ML early warning: 59% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 84 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern Intermittent · 7 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 9 functional locations
8 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_PP-912-M MOTOR FOR PP-912 | A | 4 | 1 | 0.19 |
| PX_KC-620A DEMIN WATER AIR COMPRESSOR | B | 1 | 2 | 1.00 |
| PX_PP-958B SEAL OIL PUMP | B | 1 | 2 | 0.62 |
| PX_PP-210A HYDROGEN PUMP | B | 1 | 1 | 0.19 |
| PX_PP-1663B-M MOTOR FOR PP-1663B | B | 1 | 0 | 0.19 |
| PX_PP-319B ETHYLENE PUMP | B | 1 | 0 | 0.19 |
| PX_PP-1807C-M MOTOR FOR PP-1807C | S | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 44 ± 40 days (PO history + category, 2 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Feb 2026 | PR03 Regular replenishment | 5 | Rp 521,029 | 20 Mar 2026 | 34 d |
| 11 Nov 2025 | PR06 Regular replenishment | 5 | Rp 493,895 | 30 Nov 2025 | 19 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Aug 2027 | PX_KC-620A | Compressor major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Aug 2026 | Medium | PX_PP-958B | PP-958B discharge pressure low |
| 26 May 2026 | Low | PX_KT-397A | Follow up after steam upset KT-397A |
| 16 May 2026 | Medium | PX_KT-397A | Replace lamp as per PM finding |
| 14 May 2026 | Low | PX_KT-397A | KT-397A trip test |
| 02 Apr 2026 | Medium | PX_KT-397A | Follow up after steam upset KT-397A |
| 15 Dec 2025 | Medium | PX_KC-620A | Inspect coupling KC-620A |
| 12 Dec 2025 | Low | PX_KT-460B | KT-460B governor valve hunting |
| 27 Jul 2025 | Medium | PX_KT-460B | Follow up after steam upset KT-460B |
| 21 May 2025 | Medium | PX_PP-958B | Install scaffolding at PP-958B |
| 14 May 2025 | Low | PX_PP-912-M | Install scaffolding at PP-912-M |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Jul 2026 | 2 | 209000012005 | Other maintenance |
| 12 Jun 2026 | 3 | 201000023717 | Corrective |
| 29 Jan 2026 | 1 | 201000011859 | Corrective |
| 24 Jan 2026 | 1 | 201000003273 | Corrective |
| 11 Dec 2025 | 1 | 201000018729 | Corrective |
| 10 Nov 2025 | 1 | 203000023445 | Turnaround |
| 05 Oct 2025 | 1 | 201000006219 | Corrective |
| 15 Sept 2025 | 1 | 201000012551 | Corrective |