BEARING,BALL,ANGULAR,6306BDB

Material 4100000460 · BEARING · Plant 1000

ALong-leadReduceExcess
Material
4100000460
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
MITRA PERKASA NUSANTARA PT
Lead time
81 d · P80 116 d
Unit price
Rp 634,646

Recommendation

  • 1.Forecast 8.3 EA/year: 8.3 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~81 days; expected demand during lead time 1.8.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 18.
  • 4.Stock 100 exceeds the level to keep (18) by 82.
  • 5.Long lead time: 80% of deliveries took up to 116 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
  • 7.ML early warning: 86% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 5Single sourceOpen PO
On hand / on order
100 / 14
next delivery 24 Oct 2026
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 8
Rec. Max
18
order qty 9
Service level
100.0%
stockout risk now 0%
Unit price
Rp 634,646
PO history
ML early warning: 86% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 20 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (7 units) excluded from the baseline.

Demand pattern Intermittent · 13 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 6 functional locations

5 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-308B
REFLUX BLOWER
A162.28
PX_KC-316D
METHANOL FAN
A151.43
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_PP-1063-M
MOTOR FOR PP-1063
A100.19
PX_PP-1434-M
MOTOR FOR PP-1434
A200.19
PX_KT-383A
TURBINE FOR KC-383A
S173.67

Lead time and procurement

Lead time 81 ± 42 days (PO history, 9 PO lines) · on-time 48%

PR dateTypeQtyUnit priceDeliveryLead time
19 Aug 2026PR03
Regular replenishment
8Rp 597,72812 Nov 2026
open
85 d
25 Jul 2026PR01
Import / long-lead
3Rp 597,48024 Oct 2026
open
91 d
15 Jun 2026PR03
Regular replenishment
6Rp 634,64631 Jul 202646 d
15 May 2026PR05
Project / turnaround
3Rp 634,99228 Oct 2026
open
166 d
19 Apr 2026PR03
Regular replenishment
3Rp 647,86116 Jun 202658 d
04 Oct 2025PR05
Project / turnaround
3Rp 604,85406 Mar 2026153 d
04 Oct 2025PR04
Regular (other)
6Rp 644,12630 Dec 202587 d
22 Jul 2025PR06
Regular replenishment
8Rp 610,76105 Oct 202575 d
25 Jun 2025PR06
Regular replenishment
7Rp 640,15513 Aug 202549 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
06 Sept 2026MediumPX_KC-308BInstall scaffolding at KC-308B
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
10 Aug 2026MediumPX_KC-316DOverhaul
03 Aug 2026MediumPX_KC-316DPainting KC-316D
04 Jun 2026HighPX_KC-308BRepair insulation KC-308B
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A

Recent goods issues

Posting dateQtyOrderOrder type
11 Sept 20261201000020312Corrective
11 Jun 20261201000000811Corrective
10 Mar 20261201000007497Corrective
11 Jan 20263201000025740Corrective
06 Jan 20261203000006950Turnaround
26 Dec 20251201000025566Corrective
24 Dec 20251203000006078Turnaround
20 Dec 20251201000005339Corrective
13 Dec 20251201000007088Corrective
01 Dec 20251203000037280Turnaround
28 Nov 20251201000022462Corrective
15 Nov 20252203000023445Turnaround
09 Oct 20251201000036976Corrective
30 Sept 20251201000037504Corrective
27 Aug 20251203000006603Turnaround