BEARING,BALL,1ROW,DEEP GROOVE,NU311 C3

Material 4100000493 · BEARING · Plant 1000

AReorderNormalBelow reorder point
Material
4100000493
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 7 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
44 d · P80 42 d
Unit price
Rp 1.0M

Recommendation

  • 1.Forecast 9.6 EA/year: 9.6 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~44 days; expected demand during lead time 1.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 18.
  • 4.On hand 5 + on order 0 is at or below the reorder point: order 13 now.
  • 5.Installed on 7 FuncLoc(s), 5 of them criticality A/B.
  • 6.ML early warning: 78% probability of demand in the next 90 days.
Proposed purchase requisition
13 EA
Rp 13.2M · order by 01 Oct 2026
Expected arrival ≈ 44 days
ML early warningLast turnaround used 1Single sourceAbnormal consumption
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
18
order qty 10
Service level
100.0%
stockout risk now 1%
Unit price
Rp 1.0M
PO history
ML early warning: 78% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 10 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern Intermittent · 10 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 7 functional locations

5 with criticality A/B · 13 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-222B
LEAN AMINE COMPRESSOR
A451.85
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_PP-1012C-M
MOTOR FOR PP-1012C
A420.19
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_PP-248B-M
MOTOR FOR PP-248B
B100.19
PX_PP-376
DILUTION STEAM PUMP
C100.19
PX_KC-856A
DEMIN WATER COMPRESSOR
S121.00

Lead time and procurement

Lead time 44 ± 24 days (PO history, 6 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
27 Feb 2026PR03
Regular replenishment
8Rp 1.0M22 Mar 202623 d
08 Jan 2026PR03
Regular replenishment
8Rp 1.0M19 Feb 202642 d
07 Jan 2026PR05
Project / turnaround
2Rp 985,17915 Mar 202667 d
01 Dec 2025PR03
Regular replenishment
3Rp 1.1M07 Jan 202637 d
30 Aug 2025PR03
Regular replenishment
6Rp 1.0M05 Oct 202536 d
18 Aug 2025PR03
Regular replenishment
8Rp 1.0M13 Sept 202526 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026LowPX_PP-1012C-MInstall scaffolding at PP-1012C-M
14 Jul 2026LowPX_KC-856AInstall scaffolding at KC-856A
02 Jul 2026HighPX_KC-222BReplace lamp as per PM finding
05 Feb 2026MediumPX_KC-222BInstall scaffolding at KC-222B
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
01 Jan 2026LowPX_KC-222BKC-222B high vibration
16 Nov 2025MediumPX_KC-222BKC-222B lube oil filter DP high
09 Aug 2025MediumPX_KC-856AReplace lamp as per PM finding
17 May 2025LowPX_KC-222BInstall scaffolding at KC-222B
04 May 2025MediumPX_PP-1012C-MPSM25/Megger test PP-1012C-M

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20262201000022167Corrective
15 Aug 20261201000021258Corrective
23 Jun 20261201000013071Corrective
29 Jan 20264201000011859Corrective
31 Dec 20251203000036002Turnaround
11 Dec 20251201000037273Corrective
10 Dec 20251201000018729Corrective
11 Oct 20251201000002143Corrective
03 Sept 20251201000004544Corrective
26 Aug 20251209000009999Other maintenance
18 Aug 20253201000038005Corrective