BEARING,BALL,ANGULAR,6309 C3
Material 4100000605 · BEARING · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100000605
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 11 FuncLocs A/B)
- Supplier
- ANUGRAH INSTRUMEN SENTOSA PT
- Lead time
- 56 d · P80 63 d
- Unit price
- Rp 3.4M
Recommendation
- 1.Forecast 6.6 EA/year: 6.6 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~56 days; expected demand during lead time 1.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 12.
- 4.On hand 5 + on order 0 is at or below the reorder point: order 7 now.
- 5.Installed on 11 FuncLoc(s), 8 of them criticality A/B.
- 6.ML early warning: 58% probability of demand in the next 90 days.
Proposed purchase requisition
7 EA
Rp 23.7M · order by 01 Oct 2026
Expected arrival ≈ 56 days
ML early warningSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
12
order qty 6
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.4M
PO history
ML early warning: 58% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 12 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 8 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 11 functional locations
8 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-732D METHANOL COMPRESSOR | A | 1 | 6 | 3.14 |
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KC-447 LUBE OIL COMPRESSOR | A | 1 | 4 | 1.85 |
| PX_KC-279C C3 RECYCLE COMPRESSOR | A | 1 | 3 | 1.43 |
| PX_PP-601-M MOTOR FOR PP-601 | A | 1 | 2 | 1.05 |
| PX_PP-500-M MOTOR FOR PP-500 | A | 1 | 0 | 0.19 |
| PX_KC-853D SLOP OIL COMPRESSOR | B | 1 | 4 | 1.85 |
| PX_KC-371B BOTTOM FAN | B | 1 | 0 | 0.57 |
| PX_PP-224-M MOTOR FOR PP-224 | C | 1 | 0 | 0.19 |
| PX_KC-856A DEMIN WATER COMPRESSOR | S | 1 | 2 | 1.00 |
| PX_KT-875 TURBINE FOR KC-875 | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 56 ± 30 days (PO history, 7 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Apr 2026 | PR03 Regular replenishment | 2 | Rp 3.4M | 26 May 2026 | 29 d |
| 27 Mar 2026 | PR03 Regular replenishment | 4 | Rp 3.4M | 29 May 2026 | 63 d |
| 19 Feb 2026 | PR06 Regular replenishment | 4 | Rp 3.4M | 01 Apr 2026 | 41 d |
| 27 Dec 2025 | PR04 Regular (other) | 2 | Rp 3.5M | 19 Feb 2026 | 54 d |
| 11 Sept 2025 | PR06 Regular replenishment | 2 | Rp 3.4M | 12 Nov 2025 | 62 d |
| 13 Jul 2025 | PR01 Import / long-lead | 2 | Rp 3.4M | 27 Oct 2025 | 106 d |
| 19 May 2025 | PR03 Regular replenishment | 1 | Rp 3.3M | 29 Jun 2025 | 41 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Sept 2026 | Medium | PX_KC-279C | Overhaul |
| 17 Aug 2026 | Medium | PX_KC-447 | Leak from packing |
| 26 Jul 2026 | Medium | PX_KC-732D | KC-732D bearing temp high |
| 22 Jul 2026 | High | PX_PP-601-M | Leak from packing |
| 14 Jul 2026 | Low | PX_KC-856A | Install scaffolding at KC-856A |
| 07 Jul 2026 | Medium | PX_KC-447 | Replace lamp as per PM finding |
| 03 Jul 2026 | Medium | PX_KC-279C | Inspect coupling KC-279C |
| 26 May 2026 | Low | PX_KT-397A | Follow up after steam upset KT-397A |
| 16 May 2026 | Medium | PX_KT-397A | Replace lamp as per PM finding |
| 14 May 2026 | Low | PX_KT-397A | KT-397A trip test |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Sept 2026 | 1 | 201000013046 | Corrective |
| 02 Sept 2026 | 1 | 201000017833 | Corrective |
| 25 Jan 2026 | 1 | 201000028000 | Corrective |
| 21 Jan 2026 | 1 | 201000015985 | Corrective |
| 07 Dec 2025 | 2 | 201000039386 | Corrective |
| 11 Aug 2025 | 1 | 205000008235 | Other maintenance |
| 31 Jul 2025 | 1 | 209000022794 | Other maintenance |
| 21 Jun 2025 | 1 | 201000027756 | Corrective |