BEARING,ROLLER,CYL,1ROW,NU318 C3
Material 4100000634 · BEARING · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100000634
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 11 FuncLocs A/B)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 58 d · P80 76 d
- Unit price
- Rp 704,878
Recommendation
- 1.Forecast 5.2 EA/year: 5.2 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~58 days; expected demand during lead time 0.8.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 11.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 9 now.
- 5.Installed on 11 FuncLoc(s), 8 of them criticality A/B.
- 6.ML early warning: 65% probability of demand in the next 90 days.
Proposed purchase requisition
9 EA
Rp 6.3M · order by 01 Oct 2026
Expected arrival ≈ 58 days
ML early warningLast turnaround used 2Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
11
order qty 6
Service level
100.0%
stockout risk now 5%
Unit price
Rp 704,878
PO history
ML early warning: 65% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 241 days ago, 16 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 11 functional locations
8 with criticality A/B · 16 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_KC-419A PROPYLENE FAN | A | 1 | 19 | 5.71 |
| PY_KC-636C SLOP OIL COMPRESSOR | A | 2 | 1 | 0.57 |
| PX_KC-178A QUENCH OIL FAN | A | 1 | 0 | 0.57 |
| PX_KC-250D PROPYLENE FAN | A | 1 | 0 | 0.57 |
| PX_KC-621 SEAL OIL FAN | A | 1 | 0 | 0.57 |
| PX_PP-1194B RICH AMINE PUMP | A | 2 | 0 | 0.19 |
| PX_PP-715A LEAN AMINE PUMP | B | 1 | 2 | 0.62 |
| PX_PP-1751A BFW PUMP | B | 1 | 0 | 0.19 |
| PX_KC-910C-M MOTOR FOR KC-910C | C | 1 | 0 | 0.57 |
| PX_KC-773A REFLUX COMPRESSOR | S | 1 | 25 | 9.99 |
| PX_PP-1906B LUBE OIL PUMP | S | 4 | 0 | 0.19 |
Lead time and procurement
Lead time 58 ± 32 days (PO history, 3 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Jun 2026 | PR03 Regular replenishment | 1 | Rp 678,473 | 03 Sept 2026 | 74 d |
| 23 Apr 2026 | PR03 Regular replenishment | 5 | Rp 704,878 | 27 May 2026 | 34 d |
| 12 May 2025 | PR03 Regular replenishment | 2 | Rp 738,245 | 28 Jul 2025 | 77 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | High | PY_KC-419A | Overhaul |
| 26 Sept 2026 | Emergency | PX_KC-773A | Inspect coupling KC-773A |
| 24 Sept 2026 | Low | PX_PP-715A | Leak from packing |
| 23 Sept 2026 | Medium | PY_KC-419A | Inspect coupling KC-419A |
| 18 Sept 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 15 Sept 2026 | Low | PX_KC-773A | Install scaffolding at KC-773A |
| 31 Aug 2026 | Medium | PY_KC-419A | Install cover plate for MCP cracking |
| 28 Aug 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 23 Aug 2026 | Low | PX_KC-773A | KC-773A bearing temp high |
| 12 Aug 2026 | High | PY_KC-419A | KC-419A lube oil filter DP high |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Feb 2026 | 1 | 201000016884 | Corrective |
| 07 Jan 2026 | 1 | 201000013649 | Corrective |
| 27 Dec 2025 | 1 | 201000036410 | Corrective |
| 15 Dec 2025 | 1 | 201000028838 | Corrective |
| 05 Dec 2025 | 1 | 201000009071 | Corrective |
| 30 Nov 2025 | 1 | 209000037038 | Other maintenance |
| 20 Nov 2025 | 1 | 201000019339 | Corrective |
| 03 Nov 2025 | 2 | 203000039255 | Turnaround |
| 31 Aug 2025 | 1 | 201000023581 | Corrective |
| 03 Aug 2025 | 1 | 201000012606 | Corrective |