BEARING,BALL,ANGULAR,7205
Material 4100000664 · BEARING · Plant 1000
AReduceExcess
- Material
- 4100000664
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 7 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 47 d · P80 54 d
- Unit price
- Rp 2.3M
Recommendation
- 1.Forecast 5.9 EA/year: 5.9 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~47 days; expected demand during lead time 0.8.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 11.
- 4.Stock 33 exceeds the level to keep (11) by 22.
- 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 49% probability of demand in the next 90 days.
ML early warningSingle sourceAbnormal consumption
On hand / on order
33 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
11
order qty 6
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.3M
PO history
ML early warning: 49% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 34 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 6 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 7 functional locations
4 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-155D CAUSTIC BLOWER | A | 3 | 0 | 0.57 |
| PX_KC-476C ETHYLENE FAN | A | 1 | 0 | 0.57 |
| PX_PP-891C CHARGE GAS PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1663B-M MOTOR FOR PP-1663B | B | 1 | 0 | 0.19 |
| PX_PP-1141D DILUTION STEAM PUMP | C | 1 | 0 | 0.19 |
| PX_PP-812A-M MOTOR FOR PP-812A | C | 1 | 0 | 0.19 |
| PX_KT-875 TURBINE FOR KC-875 | S | 3 | 0 | 1.10 |
Lead time and procurement
Lead time 47 ± 27 days (PO history, 4 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Jun 2026 | PR06 Regular replenishment | 2 | Rp 2.3M | 21 Aug 2026 | 53 d |
| 16 May 2026 | PR06 Regular replenishment | 2 | Rp 2.2M | 10 Jul 2026 | 55 d |
| 05 Jun 2025 | PR06 Regular replenishment | 2 | Rp 2.3M | 27 Jun 2025 | 22 d |
| 20 May 2025 | PR03 Regular replenishment | 2 | Rp 2.3M | 20 Jun 2025 | 31 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Aug 2026 | 4 | 201000038773 | Corrective |
| 13 Apr 2026 | 1 | 201000001667 | Corrective |
| 20 Jan 2026 | 2 | 201000011077 | Corrective |
| 20 Jan 2026 | 1 | 201000014201 | Corrective |
| 14 Jan 2026 | 1 | 201000012328 | Corrective |
| 18 Nov 2025 | 1 | 201000028917 | Corrective |
| 28 Aug 2025 | 1 | 201000024177 | Corrective |