BEARING,BALL,ANGULAR,6213

Material 4100000669 · BEARING · Plant 1000

AReorderCriticalStockout
Material
4100000669
Category
BEARING
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
46 d · P80 45 d
Unit price
Rp 1.9M

Recommendation

  • 1.Forecast 4.8 EA/year: 4.8 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~46 days; expected demand during lead time 0.6.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
  • 6.ML early warning: 48% probability of demand in the next 90 days.
Proposed purchase requisition
10 EA
Rp 18.7M · order by 01 Oct 2026
Expected arrival ≈ 46 days
ML early warningConvert to Stock ItemLast turnaround used 2Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
99.9%
stockout risk now 33%
Unit price
Rp 1.9M
PO history
ML early warning: 48% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 119 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 5 functional locations

2 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_PP-1470A-M
MOTOR FOR PP-1470A
A130.62
PX_KT-624A
TURBINE FOR KC-624A
S132.39
PX_PP-978
SPENT CAUSTIC PUMP
S110.19
PX_KC-293B
C4 PRODUCT COMPRESSOR
S300.57

Lead time and procurement

Lead time 46 ± 28 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
12 Jul 2026PR06
Regular replenishment
5Rp 1.8M16 Aug 202635 d
23 Jul 2025PR06
Regular replenishment
1Rp 1.9M13 Sept 202552 d
23 May 2025PR06
Regular replenishment
2Rp 1.9M14 Jun 202522 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
07 Dec 2025MediumPX_PP-1470A-MPP-1470A-M high temp
29 Nov 2025MediumPX_PP-1470A-MInstall scaffolding at PP-1470A-M
17 Jun 2025MediumPX_KT-624A[MSI-B-25-SWV-127/M] Replace line
21 May 2025MediumPX_PP-1470A-MInstall scaffolding at PP-1470A-M

Recent goods issues

Posting dateQtyOrderOrder type
04 Jun 20261201000022908Corrective
20 Mar 20261201000005983Corrective
21 Jan 20261201000009101Corrective
09 Jan 20262203000006950Turnaround
24 Sept 20252201000015442Corrective
05 Jul 20251201000030786Corrective
26 Jun 20253201000018787Corrective