Sparely
DU

BEARING,BALL,1ROW,DEEP GROOVE,6311 C3

Material 4100000708 · BEARING · Plant 1000

ALong-leadMonitorHealthy
Material
4100000708
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 9 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
77 d · P80 111 d
Unit price
Rp 806,067

Recommendation

  • 1.Forecast 5.5 EA/year: 5.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~77 days; expected demand during lead time 1.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 12.
  • 4.Long lead time: 80% of deliveries took up to 111 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 9 FuncLoc(s), 5 of them criticality A/B.
  • 6.ML early warning: 59% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 7Single sourceOpen PO
On hand / on order
1 / 6
next delivery 22 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
12
order qty 6
Service level
99.9%
stockout risk now 0%
Unit price
Rp 806,067
PO history
ML early warning: 59% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 40 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (7 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 9 functional locations

5 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-316D
METHANOL FAN
A151.43
PX_PP-588
DILUTION STEAM PUMP
A120.19
PX_PP-479
SEAL OIL PUMP
B1102.76
PX_PP-1807C
C3 RECYCLE PUMP
B161.47
PX_PP-657C
SEAL OIL PUMP
B100.19
PX_PP-1099-M
MOTOR FOR PP-1099
C100.19
PX_KC-843
FUEL OIL COMPRESSOR
S2218.28
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KC-236B
DILUTION STEAM FAN
S110.57

Lead time and procurement

Lead time 77 ± 50 days (PO history, 6 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
11 Sept 2026PR03
Regular replenishment
6Rp 809,70922 Oct 2026
open
41 d
07 May 2026PR03
Regular replenishment
4Rp 802,42406 Aug 202691 d
17 Feb 2026PR06
Regular replenishment
3Rp 843,07408 Jun 2026111 d
08 Sept 2025PR06
Regular replenishment
4Rp 794,90622 Nov 202575 d
03 Sept 2025PR03
Regular replenishment
5Rp 833,15404 Oct 202531 d
22 Aug 2025PR03
Regular replenishment
4Rp 799,60621 Feb 2026183 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_KC-843Painting KC-843
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026LowPX_KC-843Inspect coupling KC-843
12 Sept 2026MediumPX_PP-479Install scaffolding at PP-479
29 Aug 2026MediumPX_KC-843Replace lamp as per PM finding
26 Aug 2026MediumPX_KC-843[MSI-B-26-RLH-211] Permanent repair
18 Aug 2026MediumPX_PP-479Oil leak at PP-479 bearing housing
14 Aug 2026MediumPX_KC-843KC-843 lube oil filter DP high
12 Aug 2026MediumPX_PP-588Install scaffolding at PP-588
10 Aug 2026MediumPX_KC-316DOverhaul

Recent goods issues

Posting dateQtyOrderOrder type
22 Aug 20261201000013554Corrective
22 Jan 20261201000012637Corrective
19 Jan 20266203000029956Turnaround
28 Dec 20251203000036428Turnaround
23 Dec 20251201000030237Corrective
16 Dec 20251201000036707Corrective
13 Jun 20252204000029365Preventive