Sparely
DU

BEARING,BALL,ANGULAR,NU311

Material 4100000731 · BEARING · Plant 1000

AReorderNormalBelow reorder point
Material
4100000731
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
BERKAH INSTRUMEN NUSANTARA PT
Lead time
42 d · P80 48 d
Unit price
Rp 642,963

Recommendation

  • 1.Forecast 6.3 EA/year: 6.3 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~42 days; expected demand during lead time 0.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 12.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 9 now.
  • 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 58% probability of demand in the next 90 days.
Proposed purchase requisition
9 EA
Rp 5.8M · order by 01 Oct 2026
Expected arrival ≈ 42 days
ML early warningLast turnaround used 1Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
12
order qty 7
Service level
100.0%
stockout risk now 2%
Unit price
Rp 642,963
PO history
ML early warning: 58% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 16 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 7 functional locations

4 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-308B
REFLUX BLOWER
A162.28
PX_PP-1634A
QUENCH OIL PUMP
A110.19
PX_KC-621
SEAL OIL FAN
A100.57
PX_PP-310C-M
MOTOR FOR PP-310C
B100.19
PX_KC-582B
CAUSTIC BLOWER
S1103.57
PX_KC-373
SPENT CAUSTIC BLOWER
S211.00
PX_KC-383A
CAUSTIC BLOWER
S111.00

Lead time and procurement

Lead time 42 ± 30 days (PO history, 5 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
25 Jul 2026PR03
Regular replenishment
2Rp 642,96305 Aug 202611 d
22 Jun 2026PR01
Import / long-lead
4Rp 640,97001 Sept 202671 d
21 Jan 2026PR03
Regular replenishment
3Rp 676,43104 Mar 202642 d
15 Nov 2025PR03
Regular replenishment
4Rp 637,14508 Dec 202523 d
06 May 2025PR03
Regular replenishment
4Rp 693,58126 May 202520 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Sept 2026MediumPX_KC-308BInstall scaffolding at KC-308B
01 Sept 2026HighPX_KC-582BKC-582B high vibration
26 Aug 2026LowPX_KC-582BPainting KC-582B
08 Jul 2026LowPX_KC-582BInstall scaffolding at KC-582B
04 Jun 2026HighPX_KC-308BRepair insulation KC-308B
08 May 2026MediumPX_KC-308B[MSI-B-26-PPX-327] Permanent repair
28 Apr 2026HighPX_KC-582BKC-582B lube oil filter DP high
20 Apr 2026EmergencyPX_KC-582BRepair insulation KC-582B
29 Nov 2025MediumPX_KC-308BKC-308B lube oil filter DP high
12 Nov 2025LowPX_KC-308BOverhaul

Recent goods issues

Posting dateQtyOrderOrder type
15 Sept 20261201000023637Corrective
03 Aug 20261201000003257Corrective
23 Jan 20261203000022287Turnaround
20 Nov 20251201000010027Corrective
03 Oct 20252201000023082Corrective
28 Sept 20252201000001548Corrective
19 Sept 20251201000020492Corrective
04 Sept 20251203000006879Turnaround
23 Aug 20251201000015337Corrective
21 Jul 20251209000008467Other maintenance
07 Jul 20251201000028048Corrective