BEARING,BALL,ANGULAR,6319

Material 4100000732 · BEARING · Plant 1000

ALong-leadMonitorStockout
Material
4100000732
Category
BEARING
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
BERKAH TEKNIK GLOBAL PT
Lead time
72 d · P80 112 d
Unit price
Rp 3.4M

Recommendation

  • 1.Forecast 2.0 EA/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~72 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
  • 4.Long lead time: 80% of deliveries took up to 112 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
  • 6.ML early warning: 36% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemLast turnaround used 2Single sourceOpen PO
On hand / on order
0 / 5
next delivery 30 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.4M
PO history
ML early warning: 36% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 259 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (3 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 787.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 3 functional locations

2 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_PP-1157
ETHYLENE PUMP
B110.19
PX_PP-1099-M
MOTOR FOR PP-1099
C400.19

Lead time and procurement

Lead time 72 ± 42 days (PO history, 7 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
07 Sept 2026PR03
Regular replenishment
3Rp 3.4M30 Oct 2026
open
53 d
04 Aug 2026PR01
Import / long-lead
2Rp 3.7M09 Dec 2026
open
127 d
10 Mar 2026PR06
Regular replenishment
2Rp 3.7M09 Apr 202630 d
22 Nov 2025PR06
Regular replenishment
2Rp 3.5M01 Mar 202699 d
18 Nov 2025PR04
Regular (other)
4Rp 3.4M10 Mar 2026112 d
30 Aug 2025PR01
Import / long-lead
3Rp 3.4M19 Dec 2025111 d
26 Aug 2025PR06
Regular replenishment
2Rp 3.4M16 Sept 202521 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
18 May 2025MediumPX_PP-1157Overhaul PP-1157
15 May 2025LowPX_KT-419APSM25/Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
15 Jan 20262201000006923Corrective
25 Nov 20252203000032713Turnaround
11 Nov 20251201000037614Corrective
06 Oct 20251201000022289Corrective
24 Jun 20251203000034428Turnaround
21 May 20251201000015314Corrective