BEARING,BALL,ANGULAR,6319
Material 4100000732 · BEARING · Plant 1000
ALong-leadMonitorStockout
- Material
- 4100000732
- Category
- BEARING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- BERKAH TEKNIK GLOBAL PT
- Lead time
- 72 d · P80 112 d
- Unit price
- Rp 3.4M
Recommendation
- 1.Forecast 2.0 EA/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~72 days; expected demand during lead time 0.4.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
- 4.Long lead time: 80% of deliveries took up to 112 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
- 6.ML early warning: 36% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemLast turnaround used 2Single sourceOpen PO
On hand / on order
0 / 5
next delivery 30 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.4M
PO history
ML early warning: 36% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 259 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (3 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 787.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 3 functional locations
2 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_PP-1157 ETHYLENE PUMP | B | 1 | 1 | 0.19 |
| PX_PP-1099-M MOTOR FOR PP-1099 | C | 4 | 0 | 0.19 |
Lead time and procurement
Lead time 72 ± 42 days (PO history, 7 PO lines) · on-time 31%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Sept 2026 | PR03 Regular replenishment | 3 | Rp 3.4M | 30 Oct 2026 open | 53 d |
| 04 Aug 2026 | PR01 Import / long-lead | 2 | Rp 3.7M | 09 Dec 2026 open | 127 d |
| 10 Mar 2026 | PR06 Regular replenishment | 2 | Rp 3.7M | 09 Apr 2026 | 30 d |
| 22 Nov 2025 | PR06 Regular replenishment | 2 | Rp 3.5M | 01 Mar 2026 | 99 d |
| 18 Nov 2025 | PR04 Regular (other) | 4 | Rp 3.4M | 10 Mar 2026 | 112 d |
| 30 Aug 2025 | PR01 Import / long-lead | 3 | Rp 3.4M | 19 Dec 2025 | 111 d |
| 26 Aug 2025 | PR06 Regular replenishment | 2 | Rp 3.4M | 16 Sept 2025 | 21 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 20 Nov 2025 | Medium | PX_KT-419A | Leak from packing |
| 10 Nov 2025 | Medium | PX_KT-419A | Painting KT-419A |
| 03 Sept 2025 | Medium | PX_KT-419A | Follow up after steam upset KT-419A |
| 18 May 2025 | Medium | PX_PP-1157 | Overhaul PP-1157 |
| 15 May 2025 | Low | PX_KT-419A | PSM25/Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Jan 2026 | 2 | 201000006923 | Corrective |
| 25 Nov 2025 | 2 | 203000032713 | Turnaround |
| 11 Nov 2025 | 1 | 201000037614 | Corrective |
| 06 Oct 2025 | 1 | 201000022289 | Corrective |
| 24 Jun 2025 | 1 | 203000034428 | Turnaround |
| 21 May 2025 | 1 | 201000015314 | Corrective |