BEARING,BALL,ANGULAR,6317
Material 4100000756 · BEARING · Plant 1000
AMaintainHealthy
- Material
- 4100000756
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 4.8 EA/year: 4.8 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~55 days; expected demand during lead time 0.7.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
- 4.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
- 5.ML early warning: 43% probability of demand in the next 90 days.
ML early warningPrice estimatedLead time estimated
On hand / on order
8 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 43% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 70 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 7 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 5 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-244A-M MOTOR FOR PP-244A | A | 1 | 3 | 1.47 |
| PX_KC-618B WASH WATER BLOWER | A | 1 | 0 | 0.57 |
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
| PX_KT-875 TURBINE FOR KC-875 | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 25 May 2026 | Low | PX_PP-244A-M | PP-244A-M bearing noise |
| 13 May 2026 | Low | PX_KT-447 | KT-447 trip test |
| 19 Apr 2026 | Low | PX_KT-447 | Follow up after steam upset KT-447 |
| 30 Mar 2026 | Low | PX_KT-447 | Leak from packing |
| 28 Mar 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 14 Mar 2026 | Medium | PX_KT-447 | KT-447 steam leak at gland |
| 14 Jan 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 21 Nov 2025 | Medium | PX_KT-447 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Jul 2026 | 1 | 201000027503 | Corrective |
| 09 Mar 2026 | 1 | 201000025379 | Corrective |
| 31 Dec 2025 | 1 | 201000013760 | Corrective |
| 02 Dec 2025 | 1 | 201000006865 | Corrective |
| 30 Oct 2025 | 1 | 209000022917 | Other maintenance |
| 14 Jul 2025 | 1 | 209000039143 | Other maintenance |
| 14 Jun 2025 | 2 | 201000013381 | Corrective |