BEARING,ROLLER,CYL,1ROW,NU305
Material 4100000767 · BEARING · Plant 1000
AMonitorHealthy
- Material
- 4100000767
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 6 FuncLocs A/B)
- Supplier
- BERKAH LOGAM GLOBAL PT
- Lead time
- 42 d · P80 50 d
- Unit price
- Rp 597,211
Recommendation
- 1.Forecast 4.8 EA/year: 4.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~42 days; expected demand during lead time 0.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
- 4.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
- 5.ML early warning: 56% probability of demand in the next 90 days.
ML early warningLast turnaround used 1Single sourceAbnormal consumption
On hand / on order
6 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
99.9%
stockout risk now 0%
Unit price
Rp 597,211
PO history
ML early warning: 56% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 86 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (3 units) excluded from the baseline.
Demand pattern Lumpy · 4 issue days · 1 abnormal issue(s) capped · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 6 functional locations
5 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KC-317B RICH AMINE FAN | A | 1 | 4 | 1.85 |
| PY_PP-1056 QUENCH WATER PUMP | A | 1 | 3 | 1.05 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_PP-304 C3 RECYCLE PUMP | A | 1 | 0 | 0.19 |
| PX_KC-365C INHIBITOR BLOWER | S | 1 | 7 | 3.14 |
Lead time and procurement
Lead time 42 ± 21 days (PO history, 7 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 23 Jun 2026 | PR03 Regular replenishment | 2 | Rp 578,659 | 30 Jul 2026 | 37 d |
| 08 Jun 2026 | PR03 Regular replenishment | 3 | Rp 597,211 | 01 Aug 2026 | 54 d |
| 29 Jan 2026 | PR03 Regular replenishment | 2 | Rp 596,182 | 20 Feb 2026 | 22 d |
| 04 Dec 2025 | PR06 Regular replenishment | 2 | Rp 609,124 | 26 Jan 2026 | 53 d |
| 08 Aug 2025 | PR06 Regular replenishment | 1 | Rp 572,723 | 04 Sept 2025 | 27 d |
| 07 Jul 2025 | PR03 Regular replenishment | 3 | Rp 597,636 | 05 Aug 2025 | 29 d |
| 20 Jun 2025 | PR04 Regular (other) | 2 | Rp 615,489 | 20 Jul 2025 | 30 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-365C | KC-365C lube oil filter DP high |
| 26 Jul 2026 | Medium | PX_KC-365C | Inspect coupling KC-365C |
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 04 Jul 2026 | Low | PX_KC-317B | Replace lamp as per PM finding |
| 30 Mar 2026 | Medium | PX_KC-317B | KC-317B lube oil filter DP high |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
| 17 Dec 2025 | High | PY_PP-1056 | [MSI-B-25-SWZ-286] Permanent repair |
| 12 Dec 2025 | Low | PX_KT-460B | KT-460B governor valve hunting |
| 20 Nov 2025 | Medium | PX_KT-856A | KT-856A governor valve hunting |
| 18 Nov 2025 | Medium | PX_KC-365C | Install scaffolding at KC-365C |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Jul 2026 | 1 | 201000034569 | Corrective |
| 26 Feb 2026 | 4 | 201000000733 | Corrective |
| 21 Nov 2025 | 1 | 203000020131 | Turnaround |
| 24 Sept 2025 | 2 | 203000003244 | Turnaround |
| 08 Aug 2025 | 1 | 201000014472 | Corrective |
| 24 May 2025 | 1 | 201000012656 | Corrective |