Sparely
DU

BEARING,BALL,ANGULAR,NU318BDB

Material 4100000788 · BEARING · Plant 1000

AReorderCriticalStockout
Material
4100000788
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
BERKAH TEKNIK GLOBAL PT
Lead time
47 d · P80 48 d
Unit price
Rp 3.3M

Recommendation

  • 1.Forecast 4.1 EA/year: 4.1 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~47 days; expected demand during lead time 0.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
  • 4.On hand 0 + on order 1 is at or below the reorder point: order 8 now.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
  • 6.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
8 EA
Rp 26.7M · order by 01 Oct 2026
Expected arrival ≈ 47 days
ML early warningSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 24 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
99.9%
stockout risk now 36%
Unit price
Rp 3.3M
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 4 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 4 functional locations

3 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_PP-248B
RICH AMINE PUMP
A100.19
PX_PP-319B
ETHYLENE PUMP
B100.19
PX_KC-264A
C4 PRODUCT FAN
S151.85

Lead time and procurement

Lead time 47 ± 26 days (PO history, 4 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
25 Aug 2026PR01
Import / long-lead
1Rp 3.2M24 Oct 2026
open
60 d
08 Mar 2026PR06
Regular replenishment
1Rp 3.3M01 Apr 202624 d
10 Feb 2026PR03
Regular replenishment
2Rp 3.4M20 Mar 202638 d
25 Jul 2025PR06
Regular replenishment
2Rp 3.4M03 Sept 202540 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Jul 2026LowPX_KC-264ALeak from packing
19 Apr 2026EmergencyPX_KC-264AInstall scaffolding at KC-264A
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
30 Oct 2025LowPX_KC-264AInstall scaffolding at KC-264A
27 Sept 2025MediumPX_KC-264ALeak from packing
27 Jul 2025MediumPX_KT-460BFollow up after steam upset KT-460B
22 Jul 2025MediumPX_KC-264A[MSI-B-25-HVW-347/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
27 Sept 20261201000039607Corrective
02 Jun 20262201000003915Corrective
31 Oct 20251209000022917Other maintenance
06 Sept 20251209000002404Other maintenance
18 Aug 20251201000029840Corrective
25 Jul 20251201000001214Corrective