BEARING,BALL,ANGULAR,7210-2Z
Material 4100000792 · BEARING · Plant 1000
AReduceSlow-moving
- Material
- 4100000792
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 60 d · P80 89 d
- Unit price
- Rp 3.3M
Recommendation
- 1.Forecast 5.4 EA/year: 5.4 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~60 days; expected demand during lead time 0.9.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 11.
- 4.Stock 177 exceeds the level to keep (11) by 166.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 36% probability of demand in the next 90 days.
ML early warningLast turnaround used 4Single sourceOpen PO
On hand / on order
177 / 2
next delivery 12 Oct 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
11
order qty 5
Service level
99.8%
stockout risk now 0%
Unit price
Rp 3.3M
PO history
ML early warning: 36% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 195 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (4 units) excluded from the baseline.
Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 6 functional locations
4 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1470B WASH WATER PUMP | A | 1 | 1 | 0.19 |
| PX_PP-1063 C4 PRODUCT PUMP | A | 4 | 0 | 0.19 |
| PX_PP-1881A-M MOTOR FOR PP-1881A | A | 1 | 0 | 0.19 |
| PX_PP-136B RECYCLE ETHANE PUMP | B | 1 | 8 | 2.76 |
| PY_PP-1022B INHIBITOR PUMP | S | 2 | 4 | 1.05 |
| PX_KC-236B DILUTION STEAM FAN | S | 2 | 1 | 0.57 |
Lead time and procurement
Lead time 60 ± 43 days (PO history, 7 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 Jul 2026 | PR03 Regular replenishment | 2 | Rp 3.3M | 12 Oct 2026 open | 99 d |
| 10 May 2026 | PR03 Regular replenishment | 2 | Rp 3.2M | 27 Jun 2026 | 48 d |
| 24 Aug 2025 | PR03 Regular replenishment | 6 | Rp 3.3M | 07 Oct 2025 | 44 d |
| 07 Aug 2025 | PR03 Regular replenishment | 7 | Rp 3.3M | 23 Sept 2025 | 47 d |
| 05 Aug 2025 | PR03 Regular replenishment | 5 | Rp 3.4M | 06 Sept 2025 | 32 d |
| 14 Jul 2025 | PR01 Import / long-lead | 3 | Rp 3.4M | 07 Dec 2025 | 146 d |
| 04 Jun 2025 | PR06 Regular replenishment | 3 | Rp 3.2M | 24 Jun 2025 | 20 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_PP-136B | Oil leak at PP-136B bearing housing |
| 23 Aug 2026 | Medium | PX_PP-136B | PP-136B seal leak |
| 12 Aug 2026 | Medium | PY_PP-1022B | PP-1022B abnormal noise |
| 10 Jun 2026 | Medium | PX_PP-136B | Install scaffolding at PP-136B |
| 04 May 2026 | Low | PX_PP-136B | Oil leak at PP-136B bearing housing |
| 10 Mar 2026 | Low | PX_PP-136B | PP-136B abnormal noise |
| 10 Jan 2026 | Medium | PX_PP-136B | PP-136B discharge pressure low |
| 30 Dec 2025 | Medium | PX_PP-136B | Oil leak at PP-136B bearing housing |
| 08 Nov 2025 | Low | PY_PP-1022B | PP-1022B high vibration |
| 28 Sept 2025 | Low | PY_PP-1022B | Install scaffolding at PP-1022B |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Mar 2026 | 1 | 209000001551 | Other maintenance |
| 08 Mar 2026 | 1 | 201000038883 | Corrective |
| 08 Jan 2026 | 4 | 201000029980 | Corrective |
| 29 Dec 2025 | 2 | 201000033768 | Corrective |
| 27 Dec 2025 | 1 | 203000001878 | Turnaround |
| 16 Nov 2025 | 3 | 203000011208 | Turnaround |
| 24 Aug 2025 | 1 | 201000036094 | Corrective |
| 19 May 2025 | 2 | 201000014175 | Corrective |