BEARING,ROLLER,CYL,1ROW,7219-2Z

Material 4100000825 · BEARING · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100000825
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
62 d · P80 127 d
Unit price
Rp 3.2M

Recommendation

  • 1.Forecast 3.0 EA/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~62 days; expected demand during lead time 0.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 12.8M · order by 01 Oct 2026
Expected arrival ≈ 62 days
Long-leadLast turnaround used 2Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.2M
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 57 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1797
CHARGE GAS PUMP
A100.19
PX_KC-843
FUEL OIL COMPRESSOR
S1218.28

Lead time and procurement

Lead time 62 ± 40 days (PO history + category, 2 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
07 Feb 2026PR03
Regular replenishment
2Rp 3.3M27 May 2026109 d
18 Jan 2026PR03
Regular replenishment
2Rp 3.1M25 Feb 202638 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_KC-843Painting KC-843
16 Sept 2026LowPX_KC-843Inspect coupling KC-843
29 Aug 2026MediumPX_KC-843Replace lamp as per PM finding
26 Aug 2026MediumPX_KC-843[MSI-B-26-RLH-211] Permanent repair
14 Aug 2026MediumPX_KC-843KC-843 lube oil filter DP high
06 Aug 2026MediumPX_KC-843Replace lamp as per PM finding
02 Aug 2026EmergencyPX_KC-843[MSI-B-26-KRX-321] Permanent repair
14 Jul 2026MediumPX_KC-843KC-843 bearing temp high
09 Jun 2026LowPX_KC-843Overhaul
20 May 2026MediumPX_KC-843Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
05 Aug 20261204000027988Preventive
20 Dec 20252203000033370Turnaround
11 Oct 20251201000002527Corrective
05 Sept 20251201000010089Corrective
31 Aug 20251201000033571Corrective
05 Jul 20251209000024650Other maintenance