BEARING,ROLLER,CYL,1ROW,7219-2Z
Material 4100000825 · BEARING · Plant 1000
ALong-leadReorderNormalBelow reorder point
- Material
- 4100000825
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 62 d · P80 127 d
- Unit price
- Rp 3.2M
Recommendation
- 1.Forecast 3.0 EA/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~62 days; expected demand during lead time 0.5.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 4 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 12.8M · order by 01 Oct 2026
Expected arrival ≈ 62 days
Long-leadLast turnaround used 2Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.2M
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 57 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1797 CHARGE GAS PUMP | A | 1 | 0 | 0.19 |
| PX_KC-843 FUEL OIL COMPRESSOR | S | 1 | 21 | 8.28 |
Lead time and procurement
Lead time 62 ± 40 days (PO history + category, 2 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Feb 2026 | PR03 Regular replenishment | 2 | Rp 3.3M | 27 May 2026 | 109 d |
| 18 Jan 2026 | PR03 Regular replenishment | 2 | Rp 3.1M | 25 Feb 2026 | 38 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Medium | PX_KC-843 | Painting KC-843 |
| 16 Sept 2026 | Low | PX_KC-843 | Inspect coupling KC-843 |
| 29 Aug 2026 | Medium | PX_KC-843 | Replace lamp as per PM finding |
| 26 Aug 2026 | Medium | PX_KC-843 | [MSI-B-26-RLH-211] Permanent repair |
| 14 Aug 2026 | Medium | PX_KC-843 | KC-843 lube oil filter DP high |
| 06 Aug 2026 | Medium | PX_KC-843 | Replace lamp as per PM finding |
| 02 Aug 2026 | Emergency | PX_KC-843 | [MSI-B-26-KRX-321] Permanent repair |
| 14 Jul 2026 | Medium | PX_KC-843 | KC-843 bearing temp high |
| 09 Jun 2026 | Low | PX_KC-843 | Overhaul |
| 20 May 2026 | Medium | PX_KC-843 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 05 Aug 2026 | 1 | 204000027988 | Preventive |
| 20 Dec 2025 | 2 | 203000033370 | Turnaround |
| 11 Oct 2025 | 1 | 201000002527 | Corrective |
| 05 Sept 2025 | 1 | 201000010089 | Corrective |
| 31 Aug 2025 | 1 | 201000033571 | Corrective |
| 05 Jul 2025 | 1 | 209000024650 | Other maintenance |