Sparely
DU

BEARING,ROLLER,CYL,1ROW,7206 C3

Material 4100000832 · BEARING · Plant 1000

AReorderNormalBelow reorder point
Material
4100000832
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 2.5 EA/year: 2.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~55 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
  • 6.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
3 EA
Rp 4.3M · order by 01 Oct 2026
Expected arrival ≈ 55 days
ML early warningPrice estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 111 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 5 functional locations

3 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_PP-828B-M
MOTOR FOR PP-828B
B100.19
PY_PP-1800A-M
MOTOR FOR PP-1800A
B100.19
PX_KC-216B
LEAN AMINE FAN
S110.57
PX_KT-778A
TURBINE FOR KC-778A
S201.10

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
15 May 2025MediumPX_KC-216BKC-216B high vibration
15 May 2025LowPX_KT-419APSM25/Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
12 Jun 20261201000013103Corrective
11 Jun 20261201000016926Corrective
23 Jan 20261201000003570Corrective