BEARING,BALL,ANGULAR,6210BDB
Material 4100000874 · BEARING · Plant 1000
AReorderCriticalStockout
- Material
- 4100000874
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 5.0 EA/year: 5.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~55 days; expected demand during lead time 0.8.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 12.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 12 now.
- 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 35% probability of demand in the next 90 days.
Proposed purchase requisition
12 EA
Rp 17.1M · order by 01 Oct 2026
Expected arrival ≈ 55 days
ML early warningLast turnaround used 2Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
12
order qty 6
Service level
100.0%
stockout risk now 40%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 35% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 14 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 4 functional locations
4 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1766A ETHYLENE PUMP | A | 1 | 1 | 0.19 |
| PX_PP-912 BOTTOM PUMP | B | 1 | 2 | 0.62 |
| PX_PP-1969B FEED PUMP | B | 1 | 0 | 0.19 |
| PX_PP-657C SEAL OIL PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Jul 2026 | Medium | PX_PP-912 | Replace bearing PP-912 |
| 20 May 2025 | Medium | PX_PP-1766A | PSM25/Install cover plate for MCP cracki |
| 03 May 2025 | Medium | PX_PP-912 | PP-912 abnormal noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Sept 2026 | 1 | 201000028695 | Corrective |
| 02 Aug 2026 | 1 | 201000029979 | Corrective |
| 25 Jul 2026 | 2 | 201000024842 | Corrective |
| 19 Feb 2026 | 2 | 201000019173 | Corrective |
| 28 Dec 2025 | 1 | 203000036428 | Turnaround |
| 08 Nov 2025 | 1 | 203000039046 | Turnaround |