BEARING,ROLLER,CYL,1ROW,6208-2Z

Material 4100000941 · BEARING · Plant 1000

AReorderNormalBelow reorder point
Material
4100000941
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 4.2 EA/year: 4.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~55 days; expected demand during lead time 0.6.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 7.1M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 41 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 6 functional locations

5 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-479C
DILUTION STEAM COMPRESSOR
A152.71
PX_KC-396
WASH WATER BLOWER
A131.43
PX_PP-1758A-M
MOTOR FOR PP-1758A
A300.19
PX_KC-624A
RECYCLE ETHANE BLOWER
B152.28
PX_KT-383A
TURBINE FOR KC-383A
S173.67

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026MediumPX_KC-396Replace lamp as per PM finding
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
10 Sept 2026MediumPX_KC-479CKC-479C bearing temp high
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
21 Aug 2026MediumPX_KC-624AKC-624A high vibration
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
18 Aug 2026LowPX_KC-479CLeak from packing
10 Aug 2026MediumPX_KC-624ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
21 Aug 20261201000016473Corrective