BEARING,BALL,ANGULAR,7217 C3
Material 4100001053 · BEARING · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100001053
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 6 FuncLocs A/B)
- Supplier
- PRIMA ELEKTRIK ABADI PT
- Lead time
- 52 d · P80 127 d
- Unit price
- Rp 2.8M
Recommendation
- 1.Forecast 4.3 EA/year: 3.6 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~52 days; expected demand during lead time 0.5.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 9 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
- 7.ML early warning: 34% probability of demand in the next 90 days.
Proposed purchase requisition
9 EA
Rp 24.8M · order by 01 Oct 2026
Expected arrival ≈ 52 days
Long-leadML early warningSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
100.0%
stockout risk now 40%
Unit price
Rp 2.8M
PO history
ML early warning: 34% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 295 days ago, 5 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 6 functional locations
3 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_KC-419A PROPYLENE FAN | A | 1 | 19 | 5.71 |
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KC-250D PROPYLENE FAN | A | 1 | 0 | 0.57 |
| PX_PP-1386-M MOTOR FOR PP-1386 | C | 1 | 0 | 0.19 |
| PX_KT-264A TURBINE FOR KC-264A | S | 1 | 4 | 2.39 |
| PX_PP-978 SPENT CAUSTIC PUMP | S | 1 | 1 | 0.19 |
Lead time and procurement
Lead time 52 ± 40 days (PO history + category, 2 PO lines) · on-time 30%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Apr 2026 | PR06 Regular replenishment | 1 | Rp 2.7M | 12 Jun 2026 | 46 d |
| 28 Sept 2025 | PR03 Regular replenishment | 2 | Rp 2.9M | 15 Nov 2025 | 48 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | High | PY_KC-419A | Overhaul |
| 23 Sept 2026 | Medium | PY_KC-419A | Inspect coupling KC-419A |
| 18 Sept 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 31 Aug 2026 | Medium | PY_KC-419A | Install cover plate for MCP cracking |
| 28 Aug 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 12 Aug 2026 | High | PY_KC-419A | KC-419A lube oil filter DP high |
| 11 Jul 2026 | Medium | PY_KC-419A | KC-419A lube oil filter DP high |
| 09 Jul 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 11 Jun 2026 | Low | PX_KT-264A | Leak from packing |
| 26 May 2026 | Low | PX_KT-397A | Follow up after steam upset KT-397A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Dec 2025 | 1 | 201000030810 | Corrective |