BEARING,BALL,ANGULAR,7217 C3

Material 4100001053 · BEARING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100001053
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 6 FuncLocs A/B)
Supplier
PRIMA ELEKTRIK ABADI PT
Lead time
52 d · P80 127 d
Unit price
Rp 2.8M

Recommendation

  • 1.Forecast 4.3 EA/year: 3.6 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~52 days; expected demand during lead time 0.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 9 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
  • 7.ML early warning: 34% probability of demand in the next 90 days.
Proposed purchase requisition
9 EA
Rp 24.8M · order by 01 Oct 2026
Expected arrival ≈ 52 days
Long-leadML early warningSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
100.0%
stockout risk now 40%
Unit price
Rp 2.8M
PO history
ML early warning: 34% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 295 days ago, 5 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 6 functional locations

3 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_KC-419A
PROPYLENE FAN
A1195.71
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KC-250D
PROPYLENE FAN
A100.57
PX_PP-1386-M
MOTOR FOR PP-1386
C100.19
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_PP-978
SPENT CAUSTIC PUMP
S110.19

Lead time and procurement

Lead time 52 ± 40 days (PO history + category, 2 PO lines) · on-time 30%

PR dateTypeQtyUnit priceDeliveryLead time
27 Apr 2026PR06
Regular replenishment
1Rp 2.7M12 Jun 202646 d
28 Sept 2025PR03
Regular replenishment
2Rp 2.9M15 Nov 202548 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026HighPY_KC-419AOverhaul
23 Sept 2026MediumPY_KC-419AInspect coupling KC-419A
18 Sept 2026MediumPY_KC-419AInstall scaffolding at KC-419A
31 Aug 2026MediumPY_KC-419AInstall cover plate for MCP cracking
28 Aug 2026MediumPY_KC-419AInstall scaffolding at KC-419A
12 Aug 2026HighPY_KC-419AKC-419A lube oil filter DP high
11 Jul 2026MediumPY_KC-419AKC-419A lube oil filter DP high
09 Jul 2026MediumPY_KC-419AInstall scaffolding at KC-419A
11 Jun 2026LowPX_KT-264ALeak from packing
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A

Recent goods issues

Posting dateQtyOrderOrder type
10 Dec 20251201000030810Corrective