BEARING,BALL,1ROW,DEEP GROOVE,7217 C3

Material 4100001144 · BEARING · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100001144
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
82 d · P80 142 d
Unit price
Rp 2.1M

Recommendation

  • 1.Forecast 2.6 EA/year: 2.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~82 days; expected demand during lead time 0.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
  • 4.On hand 3 + on order 2 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 142 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 8.5M · order by 01 Oct 2026
Expected arrival ≈ 82 days
Long-leadSingle sourceOpen PO
On hand / on order
3 / 2
next delivery 01 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.1M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 414 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 651.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KC-137A
C4 PRODUCT COMPRESSOR
A121.43

Lead time and procurement

Lead time 82 ± 47 days (PO history, 3 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
02 Jun 2026PR03
Regular replenishment
2Rp 2.2M01 Oct 2026
open
121 d
22 Dec 2025PR06
Regular replenishment
2Rp 2.1M27 May 2026156 d
14 Sept 2025PR03
Regular replenishment
1Rp 2.1M02 Nov 202549 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
28 Feb 2026MediumPX_KC-137AOverhaul
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
07 Jun 2025LowPX_KC-137ALeak from packing
15 May 2025LowPX_KT-419APSM25/Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
13 Aug 20252201000032904Corrective