BEARING,BALL,1ROW,DEEP GROOVE,7204BDB

Material 4100001165 · BEARING · Plant 1000

BLong-leadReorderCriticalStockout
Material
4100001165
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
B (3 of 4 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
50 d · P80 127 d
Unit price
Rp 7.7M

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~50 days; expected demand during lead time 0.1.
  • 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 1 is at or below the reorder point: order 1 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 7.7M · order by 01 Oct 2026
Expected arrival ≈ 50 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 11 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.2%
stockout risk now 1%
Unit price
Rp 7.7M
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 263 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 123.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.

Installed on 4 functional locations

3 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-284A
WASH WATER COMPRESSOR
B121.43
PX_PP-1282
BOTTOM PUMP
B110.19
PX_PP-688-M
MOTOR FOR PP-688
B100.19
PX_KC-150A
HYDROGEN FAN
S121.00

Lead time and procurement

Lead time 50 ± 40 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
08 Sept 2026PR06
Regular replenishment
1Rp 7.7M11 Oct 2026
open
33 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Nov 2025MediumPX_KC-150AKC-150A bearing temp high
04 Sept 2025MediumPX_KC-284AKC-284A lube oil filter DP high
08 Jul 2025MediumPX_KC-284AKC-284A high vibration
21 May 2025LowPX_KC-150APSM25/Leak from packing
20 May 2025MediumPX_PP-1282Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
11 Jan 20261201000016153Corrective