BEARING,BALL,1ROW,DEEP GROOVE,7204BDB
Material 4100001165 · BEARING · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4100001165
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (3 of 4 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 50 d · P80 127 d
- Unit price
- Rp 7.7M
Recommendation
- 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~50 days; expected demand during lead time 0.1.
- 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 1 is at or below the reorder point: order 1 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 7.7M · order by 01 Oct 2026
Expected arrival ≈ 50 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 11 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.2%
stockout risk now 1%
Unit price
Rp 7.7M
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 263 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 123.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-284A WASH WATER COMPRESSOR | B | 1 | 2 | 1.43 |
| PX_PP-1282 BOTTOM PUMP | B | 1 | 1 | 0.19 |
| PX_PP-688-M MOTOR FOR PP-688 | B | 1 | 0 | 0.19 |
| PX_KC-150A HYDROGEN FAN | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 50 ± 40 days (PO history + category, 1 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 Sept 2026 | PR06 Regular replenishment | 1 | Rp 7.7M | 11 Oct 2026 open | 33 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Nov 2025 | Medium | PX_KC-150A | KC-150A bearing temp high |
| 04 Sept 2025 | Medium | PX_KC-284A | KC-284A lube oil filter DP high |
| 08 Jul 2025 | Medium | PX_KC-284A | KC-284A high vibration |
| 21 May 2025 | Low | PX_KC-150A | PSM25/Leak from packing |
| 20 May 2025 | Medium | PX_PP-1282 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Jan 2026 | 1 | 201000016153 | Corrective |