BEARING,BALL,ANGULAR,6209-2Z
Material 4100001194 · BEARING · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4100001194
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- BERKAH TEKNIK GLOBAL PT
- Lead time
- 51 d · P80 127 d
- Unit price
- Rp 1.3M
Recommendation
- 1.Forecast 6.4 EA/year: 5.7 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~51 days; expected demand during lead time 1.5 (incl. 0.7 planned).
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 14.
- 4.On hand 5 + on order 2 is at or below the reorder point: order 7 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 9.3M · order by 01 Oct 2026
Expected arrival ≈ 51 days
Long-leadSingle sourceOpen POPlanned demand in lead time
On hand / on order
5 / 2
next delivery 29 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
14
order qty 7
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.3M
PO history
ML early warning: 30% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 302 days ago, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-235D DEMIN WATER FAN | A | 1 | 2 | 1.00 |
| PX_PP-1807C C3 RECYCLE PUMP | B | 1 | 6 | 1.47 |
| PX_PP-942D RECYCLE ETHANE PUMP | C | 1 | 2 | 0.62 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
Lead time and procurement
Lead time 51 ± 40 days (PO history + category, 2 PO lines) · on-time 31%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Sept 2026 | PR06 Regular replenishment | 2 | Rp 1.3M | 29 Oct 2026 open | 40 d |
| 11 Mar 2026 | PR06 Regular replenishment | 1 | Rp 1.3M | 28 Apr 2026 | 48 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Nov 2026 | PX_KC-235D | Compressor major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 01 Jun 2026 | Medium | PX_PP-942D | PP-942D high vibration |
| 13 May 2026 | Low | PX_KT-447 | KT-447 trip test |
| 12 May 2026 | Medium | PX_PP-1807C | Install scaffolding at PP-1807C |
| 19 Apr 2026 | Low | PX_KT-447 | Follow up after steam upset KT-447 |
| 30 Mar 2026 | Low | PX_KT-447 | Leak from packing |
| 28 Mar 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 14 Mar 2026 | Medium | PX_KT-447 | KT-447 steam leak at gland |
| 24 Jan 2026 | Medium | PX_PP-1807C | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Dec 2025 | 2 | 201000027307 | Corrective |