BEARING,BALL,ANGULAR,6209-2Z

Material 4100001194 · BEARING · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100001194
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
BERKAH TEKNIK GLOBAL PT
Lead time
51 d · P80 127 d
Unit price
Rp 1.3M

Recommendation

  • 1.Forecast 6.4 EA/year: 5.7 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~51 days; expected demand during lead time 1.5 (incl. 0.7 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 14.
  • 4.On hand 5 + on order 2 is at or below the reorder point: order 7 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 9.3M · order by 01 Oct 2026
Expected arrival ≈ 51 days
Long-leadSingle sourceOpen POPlanned demand in lead time
On hand / on order
5 / 2
next delivery 29 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
14
order qty 7
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.3M
PO history
ML early warning: 30% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 302 days ago, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 4 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-235D
DEMIN WATER FAN
A121.00
PX_PP-1807C
C3 RECYCLE PUMP
B161.47
PX_PP-942D
RECYCLE ETHANE PUMP
C120.62
PX_KT-447
TURBINE FOR KC-447
S1136.24

Lead time and procurement

Lead time 51 ± 40 days (PO history + category, 2 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
19 Sept 2026PR06
Regular replenishment
2Rp 1.3M29 Oct 2026
open
40 d
11 Mar 2026PR06
Regular replenishment
1Rp 1.3M28 Apr 202648 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_KC-235DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
01 Jun 2026MediumPX_PP-942DPP-942D high vibration
13 May 2026LowPX_KT-447KT-447 trip test
12 May 2026MediumPX_PP-1807CInstall scaffolding at PP-1807C
19 Apr 2026LowPX_KT-447Follow up after steam upset KT-447
30 Mar 2026LowPX_KT-447Leak from packing
28 Mar 2026MediumPX_KT-447Follow up after steam upset KT-447
14 Mar 2026MediumPX_KT-447KT-447 steam leak at gland
24 Jan 2026MediumPX_PP-1807CReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
03 Dec 20252201000027307Corrective