BEARING,BALL,1ROW,DEEP GROOVE,6218

Material 4100001213 · BEARING · Plant 1000

ALong-leadMonitorInsurance gap
Material
4100001213
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
RAJAWALI TEKNIK PRATAMA PT
Lead time
59 d · P80 127 d
Unit price
Rp 702,071

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~59 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidateLong-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 19 Nov 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 702,071
PO history
ML early warning: 29% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 66.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-222B
LEAN AMINE COMPRESSOR
A151.85
PX_KC-284A
WASH WATER COMPRESSOR
B121.43

Lead time and procurement

Lead time 59 ± 40 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
11 Sept 2026PR03
Regular replenishment
2Rp 701,76619 Nov 2026
open
69 d
28 May 2025PR03
Regular replenishment
2Rp 702,37526 Jul 202559 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 Jul 2026HighPX_KC-222BReplace lamp as per PM finding
05 Feb 2026MediumPX_KC-222BInstall scaffolding at KC-222B
01 Jan 2026LowPX_KC-222BKC-222B high vibration
16 Nov 2025MediumPX_KC-222BKC-222B lube oil filter DP high
04 Sept 2025MediumPX_KC-284AKC-284A lube oil filter DP high
08 Jul 2025MediumPX_KC-284AKC-284A high vibration
17 May 2025LowPX_KC-222BInstall scaffolding at KC-222B

Recent goods issues

Never issued in the 17-month history.