Sparely
DU

BEARING,ROLLER,CYL,1ROW,6209 C3

Material 4100001372 · BEARING · Plant 1000

AMaintainCritical insurance spare
Material
4100001372
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 0.9 EA/year: 0.2 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~55 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 95.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 5 functional locations

2 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-669
DEMIN WATER BLOWER
A100.57
PX_PP-1397
METHANOL PUMP
B141.05
PX_PP-960
REFLUX PUMP
C300.19
PX_KC-264A
C4 PRODUCT FAN
S151.85
PX_KT-778A
TURBINE FOR KC-778A
S101.10

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
13 Aug 2027PX_PP-1397Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Aug 2026LowPX_PP-1397Replace lamp as per PM finding
12 Jul 2026LowPX_KC-264ALeak from packing
19 Apr 2026EmergencyPX_KC-264AInstall scaffolding at KC-264A
30 Oct 2025LowPX_KC-264AInstall scaffolding at KC-264A
27 Oct 2025MediumPX_PP-1397PP-1397 abnormal noise
05 Oct 2025LowPX_PP-1397Install scaffolding at PP-1397
27 Sept 2025MediumPX_KC-264ALeak from packing
22 Jul 2025MediumPX_KC-264A[MSI-B-25-HVW-347/M] Replace line
17 May 2025MediumPX_PP-1397Install scaffolding at PP-1397

Recent goods issues

Never issued in the 17-month history.