BEARING,ROLLER,CYL,1ROW,6218-2Z

Material 4100001454 · BEARING · Plant 1000

AReduceSlow-moving
Material
4100001454
Category
BEARING
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~55 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 7 exceeds the level to keep (3) by 4.
  • 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 342 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 405.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 6 functional locations

2 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-292
ETHYLENE PUMP
A131.05
PX_PP-1216C-M
MOTOR FOR PP-1216C
A400.19
PX_PP-143A
CAUSTIC PUMP
C110.19
PX_PP-953A
INHIBITOR PUMP
C100.19
PY_PP-1398C-M
MOTOR FOR PP-1398C
S130.19
PX_KC-236B
DILUTION STEAM FAN
S110.57

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Aug 2026LowPY_PP-1398C-MInstall scaffolding at PP-1398C-M
23 May 2026LowPX_PP-292[MSI-B-26-PXT-250] Permanent repair
17 Feb 2026MediumPX_PP-292PP-292 seal leak
23 Aug 2025LowPY_PP-1398C-MPainting PP-1398C-M
27 May 2025MediumPX_PP-143ALeak from packing
07 May 2025MediumPX_PP-292PP-292 discharge pressure low
07 May 2025LowPY_PP-1398C-MReplace lamp as per PM finding
06 May 2025MediumPX_KC-236BPSM25/Install scaffolding at KC-236B

Recent goods issues

Posting dateQtyOrderOrder type
24 Oct 20251201000001926Corrective