BEARING,BALL,1ROW,DEEP GROOVE,7219-2Z
Material 4100001563 · BEARING · Plant 1000
SMonitorInsurance gap
- Material
- 4100001563
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~55 days; expected demand during lead time 0.0.
- 3.A 96.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
96.1%
stockout risk now 4%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 563,895/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~23 days.
Installed on 3 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-582B CAUSTIC BLOWER | S | 1 | 10 | 3.57 |
| PX_KT-624A TURBINE FOR KC-624A | S | 1 | 3 | 2.39 |
| PX_KC-210D ETHYLENE BLOWER | S | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | High | PX_KC-582B | KC-582B high vibration |
| 26 Aug 2026 | Low | PX_KC-582B | Painting KC-582B |
| 15 Jul 2026 | Medium | PX_KT-624A | [MSI-B-26-RXR-331/M] Replace line |
| 08 Jul 2026 | Low | PX_KC-582B | Install scaffolding at KC-582B |
| 28 Apr 2026 | High | PX_KC-582B | KC-582B lube oil filter DP high |
| 20 Apr 2026 | Emergency | PX_KC-582B | Repair insulation KC-582B |
| 07 Feb 2026 | Medium | PX_KT-624A | Replace lamp as per PM finding |
| 05 Nov 2025 | Medium | PX_KC-582B | Replace lamp as per PM finding |
| 15 Oct 2025 | Medium | PX_KC-582B | Overhaul |
| 03 Oct 2025 | Medium | PX_KC-582B | KC-582B lube oil filter DP high |
Recent goods issues
Never issued in the 17-month history.