BEARING,ROLLER,CYL,1ROW,7212-2Z

Material 4100001568 · BEARING · Plant 1000

AReorderNormalTAM reserve
Material
4100001568
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~55 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Used only during the last turnaround (1 EA): keep it for the next one instead of treating it as slow-moving.
  • 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 2.8M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Last turnaround used 1Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 53.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 3 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-854C
FEED FAN
A172.28
PX_PP-200A
LEAN AMINE PUMP
A100.19
PX_PP-251A
SPENT CAUSTIC PUMP
C310.19

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Jul 2027PX_PP-200APump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_KC-854COverhaul
29 Jul 2026MediumPX_KC-854CInstall scaffolding at KC-854C
17 Jul 2026LowPX_KC-854CPainting KC-854C
13 Mar 2026MediumPX_KC-854CKC-854C bearing temp high
22 Nov 2025MediumPX_KC-854CKC-854C lube oil filter DP high
14 Sept 2025MediumPX_KC-854C[MSI-B-25-TSW-309] Permanent repair
22 May 2025MediumPX_PP-251APP-251A abnormal noise
20 May 2025MediumPX_KC-854CReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
21 Dec 20251203000014056Turnaround