BEARING,BALL,ANGULAR,NU304-2Z
Material 4100001661 · BEARING · Plant 1000
BReorderNormalSlow-moving
- Material
- 4100001661
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 4.9 EA/year: 4.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~55 days; expected demand during lead time 0.7.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 13.
- 4.On hand 5 + on order 0 is at or below the reorder point: order 8 now.
- 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 11.4M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 8
Rec. Max
13
order qty 5
Service level
99.9%
stockout risk now 2%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 342 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 153.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.
Installed on 4 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1158B FUEL OIL PUMP | B | 1 | 0 | 0.19 |
| PX_PP-128A-M MOTOR FOR PP-128A | C | 1 | 1 | 0.62 |
| PX_PP-1872A QUENCH WATER PUMP | S | 1 | 4 | 1.90 |
| PX_KT-875 TURBINE FOR KC-875 | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Aug 2026 | Medium | PX_PP-1872A | Oil leak at PP-1872A bearing housing |
| 29 Apr 2026 | Medium | PX_PP-1872A | PP-1872A discharge pressure low |
| 17 Sept 2025 | Low | PX_PP-1872A | Replace lamp as per PM finding |
| 14 Jun 2025 | Low | PX_PP-1872A | Oil leak at PP-1872A bearing housing |
| 07 Jun 2025 | Medium | PX_PP-128A-M | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Oct 2025 | 4 | 201000018388 | Corrective |