BEARING,BALL,ANGULAR,6305-2Z
Material 4100001791 · BEARING · Plant 1000
AReduceNon-moving
- Material
- 4100001791
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~55 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.Stock 113 exceeds the level to keep (4) by 109.
- 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
113 / 0
no open PO
Today Min / Max
3 / 9
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 98.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 4 functional locations
4 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-308B REFLUX BLOWER | A | 1 | 6 | 2.28 |
| PX_KC-447 LUBE OIL COMPRESSOR | A | 1 | 4 | 1.85 |
| PX_KC-223 RECYCLE ETHANE FAN | A | 1 | 0 | 0.57 |
| PX_PP-1821 CAUSTIC PUMP | A | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 Sept 2026 | Medium | PX_KC-308B | Install scaffolding at KC-308B |
| 17 Aug 2026 | Medium | PX_KC-447 | Leak from packing |
| 07 Jul 2026 | Medium | PX_KC-447 | Replace lamp as per PM finding |
| 04 Jun 2026 | High | PX_KC-308B | Repair insulation KC-308B |
| 08 May 2026 | Medium | PX_KC-308B | [MSI-B-26-PPX-327] Permanent repair |
| 29 Nov 2025 | Medium | PX_KC-308B | KC-308B lube oil filter DP high |
| 12 Nov 2025 | Low | PX_KC-308B | Overhaul |
| 07 Sept 2025 | Medium | PX_KC-447 | Replace lamp as per PM finding |
| 31 May 2025 | Medium | PX_KC-308B | Overhaul |
| 18 May 2025 | Medium | PX_KC-447 | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.