Sparely
DU

BEARING,ROLLER,CYL,1ROW,7212BDB

Material 4100001810 · BEARING · Plant 1000

BLong-leadReorderNormalBelow reorder point
Material
4100001810
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
BERKAH LOGAM GLOBAL PT
Lead time
54 d · P80 127 d
Unit price
Rp 382,887

Recommendation

  • 1.Forecast 2.9 EA/year: 2.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~54 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
  • 4.On hand 5 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 1.5M · order by 01 Oct 2026
Expected arrival ≈ 54 days
Long-leadSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 382,887
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 16 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 181.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-479
SEAL OIL PUMP
B1102.76
PX_KC-348B-M
MOTOR FOR KC-348B
C100.57

Lead time and procurement

Lead time 54 ± 40 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
22 Jun 2025PR03
Regular replenishment
2Rp 382,88710 Aug 202549 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Sept 2026MediumPX_PP-479Install scaffolding at PP-479
18 Aug 2026MediumPX_PP-479Oil leak at PP-479 bearing housing
04 Jun 2026LowPX_PP-479Replace bearing PP-479
14 May 2026MediumPX_PP-479Install scaffolding at PP-479
14 Apr 2026MediumPX_PP-479PP-479 abnormal noise
03 Apr 2026MediumPX_PP-479Install scaffolding at PP-479
20 Dec 2025MediumPX_PP-479PP-479 seal leak
21 Nov 2025MediumPX_PP-479Leak from packing
01 Sept 2025MediumPX_PP-479Leak from packing
10 May 2025LowPX_PP-479Overhaul PP-479

Recent goods issues

Posting dateQtyOrderOrder type
15 Sept 20262201000022973Corrective