BEARING,ROLLER,CYL,1ROW,7216BDB
Material 4100001851 · BEARING · Plant 1000
AMonitorSlow-moving
- Material
- 4100001851
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~55 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 393 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 633.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 4 functional locations
3 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_KC-636C SLOP OIL COMPRESSOR | A | 1 | 1 | 0.57 |
| PX_PP-389 FLUSHING OIL PUMP | B | 4 | 2 | 0.62 |
| PX_PP-1139-M MOTOR FOR PP-1139 | B | 1 | 0 | 0.19 |
| PX_KC-422A C4 PRODUCT BLOWER | S | 1 | 6 | 2.71 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Jul 2026 | Medium | PX_KC-422A | KC-422A high vibration |
| 03 Mar 2026 | Low | PX_KC-422A | Leak from packing |
| 20 Jan 2026 | Low | PX_KC-422A | Leak from packing |
| 24 Nov 2025 | Low | PX_KC-422A | KC-422A lube oil filter DP high |
| 18 Nov 2025 | Medium | PX_PP-389 | Install scaffolding at PP-389 |
| 19 Oct 2025 | Medium | PX_KC-422A | KC-422A high vibration |
| 21 Aug 2025 | Medium | PX_PP-389 | Leak from packing |
| 23 May 2025 | Low | PX_KC-422A | Overhaul |
| 21 May 2025 | Medium | PY_KC-636C | Install scaffolding at KC-636C |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Sept 2025 | 1 | 201000010182 | Corrective |