BEARING,BALL,1ROW,DEEP GROOVE,7218 C3

Material 4100001863 · BEARING · Plant 1000

AReduceNon-moving
Material
4100001863
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~55 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Stock 5 exceeds the level to keep (4) by 1.
  • 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 112.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 5 functional locations

5 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PP-1056
QUENCH WATER PUMP
A131.05
PX_PP-1634A
QUENCH OIL PUMP
A110.19
PX_KC-930C
SLOP OIL FAN
A100.57
PX_PP-494C
METHANE PUMP
B483.62
PY_PP-1063-M
MOTOR FOR PP-1063
B100.19

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Sept 2026MediumPX_PP-494COverhaul PP-494C
28 Jul 2026HighPX_PP-494CReplace lamp as per PM finding
11 Mar 2026EmergencyPX_PP-494CPP-494C seal leak
17 Dec 2025HighPY_PP-1056[MSI-B-25-SWZ-286] Permanent repair
15 Dec 2025MediumPX_PP-494CPP-494C seal leak
08 Dec 2025LowPX_PP-494CPP-494C high vibration
06 Dec 2025MediumPX_PP-494CLeak from packing
26 Oct 2025MediumPX_PP-494COil leak at PP-494C bearing housing
22 Sept 2025MediumPY_PP-1056PP-1056 abnormal noise
16 Jul 2025MediumPX_PP-494CReplace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.