BEARING,BALL,1ROW,DEEP GROOVE,7218 C3
Material 4100001863 · BEARING · Plant 1000
AReduceNon-moving
- Material
- 4100001863
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~55 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.Stock 5 exceeds the level to keep (4) by 1.
- 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 112.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 5 functional locations
5 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PP-1056 QUENCH WATER PUMP | A | 1 | 3 | 1.05 |
| PX_PP-1634A QUENCH OIL PUMP | A | 1 | 1 | 0.19 |
| PX_KC-930C SLOP OIL FAN | A | 1 | 0 | 0.57 |
| PX_PP-494C METHANE PUMP | B | 4 | 8 | 3.62 |
| PY_PP-1063-M MOTOR FOR PP-1063 | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Sept 2026 | Medium | PX_PP-494C | Overhaul PP-494C |
| 28 Jul 2026 | High | PX_PP-494C | Replace lamp as per PM finding |
| 11 Mar 2026 | Emergency | PX_PP-494C | PP-494C seal leak |
| 17 Dec 2025 | High | PY_PP-1056 | [MSI-B-25-SWZ-286] Permanent repair |
| 15 Dec 2025 | Medium | PX_PP-494C | PP-494C seal leak |
| 08 Dec 2025 | Low | PX_PP-494C | PP-494C high vibration |
| 06 Dec 2025 | Medium | PX_PP-494C | Leak from packing |
| 26 Oct 2025 | Medium | PX_PP-494C | Oil leak at PP-494C bearing housing |
| 22 Sept 2025 | Medium | PY_PP-1056 | PP-1056 abnormal noise |
| 16 Jul 2025 | Medium | PX_PP-494C | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.