BEARING,ROLLER,CYL,1ROW,6210
Material 4100001868 · BEARING · Plant 1000
BReduceNon-moving
- Material
- 4100001868
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~55 days; expected demand during lead time 0.0.
- 3.A 96.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 4 exceeds the level to keep (2) by 2.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
96.8%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 26.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1070B FUEL OIL PUMP | B | 1 | 8 | 2.76 |
| PX_PP-1516 METHANOL PUMP | B | 1 | 2 | 0.62 |
| PX_KC-891A HYDROGEN FAN | S | 1 | 5 | 1.85 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | Medium | PX_PP-1070B | Leak from packing |
| 16 Sept 2026 | Medium | PX_KC-891A | KC-891A high vibration |
| 03 Sept 2026 | Medium | PX_PP-1070B | Repair insulation PP-1070B |
| 08 Jun 2026 | Medium | PX_PP-1070B | Overhaul PP-1070B |
| 04 Jun 2026 | Medium | PX_PP-1070B | Replace bearing PP-1070B |
| 19 Apr 2026 | Emergency | PX_PP-1070B | Repair insulation PP-1070B |
| 20 Feb 2026 | Medium | PX_KC-891A | [MSI-B-26-RKP-241/M] Replace line |
| 15 Dec 2025 | Medium | PX_PP-1516 | PP-1516 discharge pressure low |
| 09 Nov 2025 | Low | PX_KC-891A | Repair insulation KC-891A |
| 04 Nov 2025 | Medium | PX_PP-1070B | Install scaffolding at PP-1070B |
Recent goods issues
Never issued in the 17-month history.