BEARING,BALL,ANGULAR,6216 C3
Material 4100002015 · BEARING · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100002015
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- DUTA ENERGI ABADI PT
- Lead time
- 49 d · P80 58 d
- Unit price
- Rp 5.1M
Recommendation
- 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~49 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 10.3M · order by 01 Oct 2026
Expected arrival ≈ 49 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 5.1M
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 251 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 335.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1224A CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PY_PP-1131 REFLUX PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 49 ± 34 days (PO history, 3 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Jun 2026 | PR03 Regular replenishment | 1 | Rp 5.1M | 03 Jul 2026 | 23 d |
| 08 Jun 2026 | PR03 Regular replenishment | 1 | Rp 5.0M | 10 Jul 2026 | 32 d |
| 25 May 2026 | PR05 Project / turnaround | 2 | Rp 5.3M | 09 Aug 2026 | 76 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Jan 2026 | 1 | 201000023958 | Corrective |
| 07 Jan 2026 | 1 | 201000035226 | Corrective |