BEARING,BALL,ANGULAR,6216 C3

Material 4100002015 · BEARING · Plant 1000

AReorderNormalSlow-moving
Material
4100002015
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
49 d · P80 58 d
Unit price
Rp 5.1M

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~49 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 10.3M · order by 01 Oct 2026
Expected arrival ≈ 49 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 5.1M
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 251 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 335.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1224A
CAUSTIC PUMP
A100.19
PY_PP-1131
REFLUX PUMP
B100.19

Lead time and procurement

Lead time 49 ± 34 days (PO history, 3 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
10 Jun 2026PR03
Regular replenishment
1Rp 5.1M03 Jul 202623 d
08 Jun 2026PR03
Regular replenishment
1Rp 5.0M10 Jul 202632 d
25 May 2026PR05
Project / turnaround
2Rp 5.3M09 Aug 202676 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
23 Jan 20261201000023958Corrective
07 Jan 20261201000035226Corrective