Sparely
DU

BEARING,BALL,ANGULAR,7212

Material 4100002095 · BEARING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100002095
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
RAJAWALI TEKNIK PRATAMA PT
Lead time
59 d · P80 127 d
Unit price
Rp 1.4M

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~59 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 4.1M · order by 01 Oct 2026
Expected arrival ≈ 59 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 9%
Unit price
Rp 1.4M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 142 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 295.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-106B
GASOLINE BLOWER
A121.00

Lead time and procurement

Lead time 59 ± 40 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
16 Feb 2026PR01
Import / long-lead
2Rp 1.3M29 May 2026102 d
04 Dec 2025PR03
Regular replenishment
1Rp 1.4M30 Dec 202526 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Feb 2026LowPX_KC-106BKC-106B high vibration
16 May 2025LowPX_KC-106BReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
12 May 20261201000024136Corrective