BEARING,BALL,ANGULAR,7212
Material 4100002095 · BEARING · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100002095
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI TEKNIK PRATAMA PT
- Lead time
- 59 d · P80 127 d
- Unit price
- Rp 1.4M
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~59 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 4.1M · order by 01 Oct 2026
Expected arrival ≈ 59 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 9%
Unit price
Rp 1.4M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 142 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 295.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-106B GASOLINE BLOWER | A | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 59 ± 40 days (PO history + category, 2 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Feb 2026 | PR01 Import / long-lead | 2 | Rp 1.3M | 29 May 2026 | 102 d |
| 04 Dec 2025 | PR03 Regular replenishment | 1 | Rp 1.4M | 30 Dec 2025 | 26 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Feb 2026 | Low | PX_KC-106B | KC-106B high vibration |
| 16 May 2025 | Low | PX_KC-106B | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 May 2026 | 1 | 201000024136 | Corrective |