BEARING,BALL,ANGULAR,6309
Material 4100002177 · BEARING · Plant 1000
AReduceNon-moving
- Material
- 4100002177
- Category
- BEARING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 0.9 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~55 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.Stock 9 exceeds the level to keep (4) by 5.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
9 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 59.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1865A METHANOL PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1213 FLUSHING OIL PUMP | C | 1 | 7 | 2.76 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 May 2027 | PX_PP-1213 | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 Sept 2026 | Medium | PX_PP-1213 | Oil leak at PP-1213 bearing housing |
| 12 Jul 2026 | Medium | PX_PP-1213 | PP-1213 discharge pressure low |
| 05 Jun 2026 | Emergency | PX_PP-1213 | Replace bearing PP-1213 |
| 28 Feb 2026 | Medium | PX_PP-1213 | Leak from packing |
| 19 Jan 2026 | Medium | PX_PP-1213 | [MSI-B-26-RUW-139] Permanent repair |
| 24 Nov 2025 | Emergency | PX_PP-1213 | Oil leak at PP-1213 bearing housing |
| 08 May 2025 | Medium | PX_PP-1213 | Overhaul PP-1213 |
Recent goods issues
Never issued in the 17-month history.