BEARING,ROLLER,CYL,1ROW,7217BDB

Material 4100002246 · BEARING · Plant 1000

CReduceSlow-moving
Material
4100002246
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
67 d · P80 127 d
Unit price
Rp 4.6M

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~67 days; expected demand during lead time 0.1.
  • 3.A 87.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 55 exceeds the level to keep (1) by 54.
Single sourceOpen PO
On hand / on order
55 / 2
next delivery 18 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
87.6%
stockout risk now 0%
Unit price
Rp 4.6M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 245 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~23 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-408B-M
MOTOR FOR PP-408B
C121.05

Lead time and procurement

Lead time 67 ± 40 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
08 Jul 2026PR03
Regular replenishment
2Rp 4.7M18 Oct 2026
open
102 d
20 Sept 2025PR03
Regular replenishment
2Rp 4.6M27 Nov 202568 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Jun 2026MediumPX_PP-408B-MMegger test PP-408B-M
28 Jul 2025MediumPX_PP-408B-MLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
29 Jan 20261201000036667Corrective
01 Sept 20251201000025653Corrective