BEARING,BALL,ANGULAR,NU314BDB
Material 4100002298 · BEARING · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100002298
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~55 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 5.7M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 35 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-752A CONDENSATE BLOWER | A | 1 | 4 | 1.85 |
| PX_KC-396 WASH WATER BLOWER | A | 1 | 3 | 1.43 |
| PX_KC-624A RECYCLE ETHANE BLOWER | B | 1 | 5 | 2.28 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-396 | Replace lamp as per PM finding |
| 21 Aug 2026 | Medium | PX_KC-624A | KC-624A high vibration |
| 10 Aug 2026 | Medium | PX_KC-624A | Leak from packing |
| 18 Jun 2026 | Low | PX_KC-624A | Overhaul |
| 17 May 2026 | Low | PX_KC-396 | Overhaul |
| 19 Feb 2026 | Medium | PX_KC-624A | Overhaul |
| 10 Dec 2025 | Medium | PX_KC-752A | Replace lamp as per PM finding |
| 18 Oct 2025 | Medium | PX_KC-752A | Replace lamp as per PM finding |
| 21 Sept 2025 | Low | PX_KC-752A | Overhaul |
| 25 May 2025 | Low | PX_KC-624A | Repair insulation KC-624A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Aug 2026 | 1 | 201000017831 | Corrective |