Sparely
DU

BEARING,BALL,1ROW,DEEP GROOVE,6310BDB

Material 4100002438 · BEARING · Plant 1000

AReduceNon-moving
Material
4100002438
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~55 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Stock 6 exceeds the level to keep (4) by 2.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 75.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-226
HYDROGEN AIR COMPRESSOR
A162.28
PX_PP-497A
FEED PUMP
B131.47

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Sept 2026LowPX_KC-226KC-226 bearing temp high
21 Aug 2026LowPX_KC-226KC-226 high vibration
16 Jan 2026LowPX_KC-226KC-226 bearing temp high
12 Dec 2025MediumPX_PP-497AReplace bearing PP-497A
10 Nov 2025LowPX_KC-226Overhaul
21 Oct 2025MediumPX_KC-226Install scaffolding at KC-226
27 Sept 2025LowPX_PP-497APP-497A high vibration
27 Jun 2025LowPX_PP-497AReplace lamp as per PM finding
23 May 2025LowPX_KC-226[MSI-B-25-BPY-311/M] Replace line

Recent goods issues

Never issued in the 17-month history.