BEARING,BALL,1ROW,DEEP GROOVE,NU317
Material 4100002611 · BEARING · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100002611
- Category
- BEARING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- BERKAH TEKNIK GLOBAL PT
- Lead time
- 41 d · P80 127 d
- Unit price
- Rp 1.1M
Recommendation
- 1.Forecast 0.8 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~41 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 2 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 2.1M · order by 01 Oct 2026
Expected arrival ≈ 41 days
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 05 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.1M
PO history
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 49.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1250 METHANE PUMP | A | 1 | 4 | 1.90 |
| PX_KC-486 CONDENSATE AIR COMPRESSOR | S | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 41 ± 40 days (PO history + category, 2 PO lines) · on-time 31%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 06 Sept 2026 | PR03 Regular replenishment | 2 | Rp 1.0M | 05 Oct 2026 open | 29 d |
| 28 Mar 2026 | PR06 Regular replenishment | 1 | Rp 1.1M | 09 Apr 2026 | 12 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Feb 2027 | PX_PP-1250 | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Dec 2025 | Low | PX_PP-1250 | PP-1250 high vibration |
| 16 Nov 2025 | High | PX_PP-1250 | Leak from packing |
| 20 Oct 2025 | Low | PX_PP-1250 | PP-1250 seal leak |
| 20 Jun 2025 | Medium | PX_PP-1250 | PP-1250 seal leak |
Recent goods issues
Never issued in the 17-month history.