BEARING,BALL,1ROW,DEEP GROOVE,NU317

Material 4100002611 · BEARING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100002611
Category
BEARING
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
BERKAH TEKNIK GLOBAL PT
Lead time
41 d · P80 127 d
Unit price
Rp 1.1M

Recommendation

  • 1.Forecast 0.8 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~41 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 0 + on order 2 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 2.1M · order by 01 Oct 2026
Expected arrival ≈ 41 days
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 05 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.1M
PO history
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 49.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1250
METHANE PUMP
A141.90
PX_KC-486
CONDENSATE AIR COMPRESSOR
S100.57

Lead time and procurement

Lead time 41 ± 40 days (PO history + category, 2 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
06 Sept 2026PR03
Regular replenishment
2Rp 1.0M05 Oct 2026
open
29 d
28 Mar 2026PR06
Regular replenishment
1Rp 1.1M09 Apr 202612 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Feb 2027PX_PP-1250Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Dec 2025LowPX_PP-1250PP-1250 high vibration
16 Nov 2025HighPX_PP-1250Leak from packing
20 Oct 2025LowPX_PP-1250PP-1250 seal leak
20 Jun 2025MediumPX_PP-1250PP-1250 seal leak

Recent goods issues

Never issued in the 17-month history.